Second Maasvlakte
PUMA, the Project Organization for the Extension of the Maasvlakte, is a joint venture of the hydraulic engineering contractors Boskalis and Van Oord. The consortium has been instructed by the Rotterdam Port Authority to build the first section of the Second Maasvlakte – the extension of the Rotterdam harbor – between 2008 and 2013.
The first phase of the Second Maasvlakte will comprise a harbor area measuring 700 hectares. The port basins will be deepened to –20m
Multi-purpose and high-tech equipment will do the work. An extensive fleet of TSHDs, cutter-suction dredgers, rockfall vessels, cranes and auxiliary equipment will be used. Between four and six TSHDs will bring 210 million m³ of sand from the offshore borrow area to the coast. Two cutter-suction dredgers will be used to deepen the port basins to –20 m and to pump 30 million m³ of sand from the existing port to the new harbor areas.
Further information and movies of dredging activities at Maasvlakte 2: http://www.maasvlakte2.com/