In 1999 the Cardiff Bay Barrage was completed to create an impounded water body as the centre piece for the regeneration of the area. A lock system, which includes three locks and an inner harbour, was incorporated into the scheme to provide marine access to the impounded bay at all states of the tide. The entrance to the locks is located at the mouth of the River Severn and is prone to high rates of siltation. In order to maintain navigable access to the locks, maintenance dredging is required twice a year. The environmental conditions in the Marine Management Organisation licence restrict dredging works to February and August.

The restricted nature of the inner harbour requires extensive planning and preparatory works, including relocating the channel marker buoys to give sufficient area for the dredgers to manoeuvre. The physical constraints prevent the trailing suction hopper dredger ‘Sospan Dau’ reaching all areas of the inner harbour, therefore specific areas are initially overdredged before the ‘Kamsar’ and plough are utilised to move silt from the tight spots into these reception areas.

The environmental restrictions, and the operational requirements for the work, means the timing of the dredging vessels on site is critical. A close liaison is maintained with both the barrage staff, for co-ordination of day-to-day operations, and with the harbour authority staff for progress and commercial matters. Payment for the works is based on volume removed, established by comparison if in and out surveys.

Related Projects

Back to top