The works comprised the removal of the built-up silt existing underneath the jetty structure close to two intakes at Tilbury Power Station.

Dredging a 10m wide x 60m box to - 3m Chart Datum next to the intakes and further box adjoining 10m wide x 60m -1m Chart Datum. The works were carried out using a multicat installed with a long reach excavator and working tidally loading into a barge.