Mooring replacement phase 2, Zafiro Producer

Mobil Equatorial Guinea Incorporated, an affiliate of ExxonMobil, entered into a contract with Boskalis for the Zafiro Producer Mooring Replacement Project Phase 2. The Zafiro Producer is installed in 180 m (590 ft)water depth approximately 74 km (40 nauticalmiles) west of Malabo, Equatorial Guinea.

The Zafiro oil field is located in the 500,000-acre Block B, 68 km (42 miles) WNW of Bioko island, Equatorial Guinea, adjacent to the international border with Nigeria. Water depths range from less than 300 ft to greater than 5,000 ft. The Zafiro-1 discovery well was drilled in February 1995, testing at 10,400 barrels per day (b/d). Three subsequent wells showed the reservoir to be relatively shallow (around 5,000 ft), and low pressure, with a bottom-hole shut-in pressure of 2,800 psig. The Zafiro Producer is a converted 268,191 dwt VLCC (very large crude carrier). The tanker was built in 1973, with an overall length of 331.5 m, a breadth of 56 m and a depth of 26.4 m. It has a draught of 20.5 m fully loaded, or 8.3 m ballasted. Early reservoir evaluation indicated that a 40,000 b/d rate could be expected from the planned eight wells, requiring the installation of an 80,000 b/d process plant, a 40 MMSCFD gas flare capacity and storage for 1.7 MMBBL of oil.The FPSO was installed in 1996 and later the storage capacity was taken over by the Serpentina changing the Zafiro Producer into a FPU (Floating Production Unit).

Mooring replacement

This 2015 campaign concluded a partial mooring replacement for ML 1, 2, 4, 8, 9, 10, 11 and 12 as well as a complete mooring replacement for ML 3. The project scope of the Phase 2 mooring replacement consisted of the following:

  • Installation of two new anchors utilizing a reaction anchor for tensioning;
  • Inspection of specified mooring components;
  • Change out of most, if not all, components for a full replacement of two of the mooring lines;
  • Change out of specified components for a partial replacement of seven of the mooring lines;
  • Removal of samples for forensic analysis.

Related projects

Selected filters
005dd16062014Boskalis-_c_Kloet_header.jpg

Transport and installation depletion compression platform,
Malampaya phase 3

The Malampaya Deep Water Gas-to-Power Project is a joint venture involving the Philippine National Oil Company, Chevron and Shell Philippines Exploration. The project is part of the optimization of the Malampaya gas field which will lead to an eight-year lifetime extension.

SMIT_Subsea_Constructor-MaerskOil_Dan_56768_header.jpg

Platform reinforcement, DABRAT

Boskalis Offshore was awarded a contract by Maersk for the DABRAT project, involving both the preparation and construction work to the Dan A and Dan B offshore oil production facilities. The extensive scope not only included the subsea installation and removal work, but also fabrication of structural items, procurement, setting up and testing of lift equipment and structural examinations. The works covered the years 2013 and 2014.

Fairmount_Sherpa_assisted_by_local_harbor_tugs_towing_in_the_FPSO_at_Haugesund_header.jpg

Tow-out and towage,
FPSO Petrojarl Knarr

Teekay awarded Fairmount Marine, a 100% subsidiary of Boskalis, a contract for the tow-out and towage of the FPSO from Geoje, South Korea to the port of Haugesund in Norway.

140718_-_48.jpg

Wintershall L8-P4

Wintershall Noordzee B.V. installed a new remote platform at L6-B as a gas production tie-back to L8-P4. L6-B is a remote and unmanned gas well unit. Utilising a dry-tree design, all control, power and metered injection for the two wells will be via the 19.5-km control umbilical between the new satellite platform L6-B and the operational gas platform L8-P4. 

DONG_Rockpiper_West_of_Duddon_Sands_header.jpg

Wind farm foundation installation, West of Duddon Sands

With 108 wind turbines producing almost 400 megawatts, West of Duddon Sands is one of the larger European wind farms. It is being built by a joint venture of Dong Energy and Scottish Power Renewables. Boskalis Offshore and Volker Stevin Offshore - in an Offshore WindForce joint venture - were responsible for the transport and installation of the 108 foundations for the wind farm.

Java-Bali_header.jpg

Submarine cables, Java-Bali

The island of Bali has been suffering a constant shortage of power. PLN contracted a Consortium of PT. Boskalis International Indonesia, Sumitomo Corporation and J-Power Systems Corporation to procure and install two 150 kV submarine and underground interconnecting power cables to replace existing cables and to reinforce the link between the electricity grids on the Indonesian islands of Java and Bali.