To main content

Inland ports
and waterways

Boskalis designs, builds and maintains inland ports and waterways. We construct channels and canals, quay walls, locks and sluices. We also offer solutions to combat high river water levels and the effects of severe rainfall. Options include widening rivers, creating secondary channels, upgrading dikes, constructing overflow areas and creating new areas for nature.

Creating cost-effective opportunities

Boskalis specializes in creating opportunities for inland ports and waterways. Costs are always crucial in any large infrastructure project. Our team of specialists not only carefully assesses your project’s economic feasibility and potential risks. We also identify the opportunities – such as re-using dredged material for building material, or to create new recreation and nature areas.

Our inland ports and waterway solutions

inland_ports.jpg
1
Suez-proefvaart_3.jpg

Channels and canals

Design, construction and maintenance.

2
RWS140517TF065.jpg

Acqueducts, bridges and sluices

Design, construction and maintenance.

3
waterfront_1409_9_Fotor.jpg

Inland ports

Design, construction and maintenance.

4
finland-vuosaari-quay-walls.jpg

Quay walls

Design, construction and maintenance.

5

Channel

Construction of a channel.

6
Shore_protection_new.jpg

Shore protection

Design, construction and maintenance.

Our projects

Selected filters
IMG_0064_header.jpg

Port development, Gothenburg

Gothenburg turns around some 34 million tons of cargo annually, including 700,000 TEU (containers), and is unique in the region. With regard to the variety and frequency of calls from intercontinental liner trade the port is outstanding in Sweden. The port can be reached from the sea via two different channels: Torshamnen Fairway and Böttö Fairway. From a navigational point of view both channels needed to be deepened and widened at a number of places. Thus there were two good reasons to enhance the fairways: securing the port’s future as the premier port for liner trade and creating safer navigation. This resulted into a major dredging contract which was awarded in June 2002 to Boskalis Westminster Dredging Company.

03_header.jpg

Remediation, Urk harbor area

Many port areas requiring dredging works have been forced to put projects on hold due to the absence of an environmentally safe solution for the disposal or processing of contaminated sediments. While this is a global problem, the availability of central, large-scale repositories in the Netherlands has transformed disposal economics at the national level. Nevertheless, the high level of debris encountered during the dredging of ports and harbors remains a major challenge to all contractors. The hydraulic transport of sediments with a high debris content is impossible.

Pusan_New_Port_5_header.jpg

Port construction, Pusan

The 4th largest container terminal in the world is located in the South East of the South Korean peninsula at Busan. As the old port is completely surrounded by the metro-city, expansion of the old port is restricted. To solve the chronic phenomenon of cargo congestion MOMAF (Ministry of Marine and Fisheries) decided in 1997 to construct a new port situated 20 km west of Busan with a final total handling capacity of 4.6 million TEU and total expenses of 4.2 billion USD.

Warnow_Tunnel__3__header.jpg

Tunnel construction Warnow, Rostock

The Warnow Tunnel is located in Rostock, Germany, at the old mouth of the river Warnow in the Baltic Sea. In the DDR period this area grew out to be the main harbor of East-Germany. After the 'turn' (die Wende) in 1989 the port more or less died. Goods came cheaper and quicker from Rotterdam, Bremen and Hamburg by rail.

Rosario_001_header.jpg

Fixed Link between Rosario and Victoria

The Joint Venture Boskalis International - Ballast Nedam JV was a subcontractor to the Consorcio Impregilo, Hochtief, Roggio and Techint which was awarded the construction of the fixed link between Rosario, in the province of Santa Fe and Victoria, in the province of Entre Rios. The Client in this project was the Argentine Government, and the leader of the Consorcio was Impregilo. The Consorciol executed all the civil constructions such as bridges while the JV Boskalis International – Ballast Nedam (BKI/BND) constructed, using sand only, the road embankments, connecting the several bridges.

DSC03484_header.jpg

Cleanup, Westergasfabriek

The Westergasfabriek was built by the British firm Imperial Continental Gas Association (ICGA) in 1883, and was at the time the biggest coal-fired gas factory in Amsterdam. The project site, covering four hectares, housed coal storage yards, gasometers, purification plants, a water tower and office buildings, all designed by the famous Dutch architect Isaac Gosschalk. The municipal energy company used the site for storage into the early 1990s.

More infra solutions

Land reclamation

Boskalis reclaimes land, improves soil, protects shorelines and realizes coastal contruction projects.

Coastal protection

Boskalis constructs traditional hard sea defenses and innovative soft sea defenses.

Environmental services

Boskalis provides a broad range of environmental services including remediation of contaminated land and dredged sediment.

Roads and railways

Boskalis develops, supervises and realizes multidisciplinary road and railway projects.

Tunnels and bridges

Boskalis designs, develops and constructs bridges and tunnels, providing solutions covering the entire process.