To main content

Offshore energy

The long term growing demand for energy is driving an increase in oil and gas exploration and production, as well as the need for renewable energy solutions. With safety as our core value, Boskalis provides a unique range of offshore services. Realizing projects in remote locations – with heightened environmental focus – is one of our specialties. We deliver services throughout the oil and gas life cycle - from exploration to production right through to decommissioning. We cover maritime and subsea transport, installation and inspection, repair and maintenance (IRM) services.

What sets us apart

Offshore_wind_farm_heavy_lift_vessel_taklift.jpg

Our commitment to safety and sustainability

Both our progressive safety program and our environmental expertise are held in high regard.

Dockwise_Vanguard_heavy_transport.jpg

A team built around your needs

With 10,700 experts, Boskalis has the resources to build a global team to meet the challenges you face.

Offshore_wind_farm_Wikinger.jpg

Our ability to manage complexity

Involve us early on and we can significantly improve your processes, mitigate risks and minimize uncertainties.

Dockwise_Vanguard_heavy_transport_Goliat_01.jpg

Unique range of integrated maritime services

Through optimal deployment of our expertise, vessels and activities, we realize complex projects around the world.

The future doesn't stop in 2050

Change means opportunities for new technology
which is exactly what the energy sector needs now.
Jeroen van der Veer, former Shell CEO, explains in
our Creating New HORIZONS magazine.

Our projects

Selected filters
005dd16062014Boskalis-_c_Kloet_header.jpg

Transport and installation depletion compression platform,
Malampaya phase 3

The Malampaya Deep Water Gas-to-Power Project is a joint venture involving the Philippine National Oil Company, Chevron and Shell Philippines Exploration. The project is part of the optimization of the Malampaya gas field which will lead to an eight-year lifetime extension.

SMIT_Subsea_Constructor-MaerskOil_Dan_56768_header.jpg

Platform reinforcement, DABRAT

Boskalis Offshore was awarded a contract by Maersk for the DABRAT project, involving both the preparation and construction work to the Dan A and Dan B offshore oil production facilities. The extensive scope not only included the subsea installation and removal work, but also fabrication of structural items, procurement, setting up and testing of lift equipment and structural examinations. The works covered the years 2013 and 2014.

Fairmount_Sherpa_assisted_by_local_harbor_tugs_towing_in_the_FPSO_at_Haugesund_header.jpg

Tow-out and towage,
FPSO Petrojarl Knarr

Teekay awarded Fairmount Marine, a 100% subsidiary of Boskalis, a contract for the tow-out and towage of the FPSO from Geoje, South Korea to the port of Haugesund in Norway.

140718_-_48.jpg

Wintershall L8-P4

Wintershall Noordzee B.V. installed a new remote platform at L6-B as a gas production tie-back to L8-P4. L6-B is a remote and unmanned gas well unit. Utilising a dry-tree design, all control, power and metered injection for the two wells will be via the 19.5-km control umbilical between the new satellite platform L6-B and the operational gas platform L8-P4. 

DONG_Rockpiper_West_of_Duddon_Sands_header.jpg

Wind farm foundation installation, West of Duddon Sands

With 108 wind turbines producing almost 400 megawatts, West of Duddon Sands is one of the larger European wind farms. It is being built by a joint venture of Dong Energy and Scottish Power Renewables. Boskalis Offshore and Volker Stevin Offshore - in an Offshore WindForce joint venture - were responsible for the transport and installation of the 108 foundations for the wind farm.

Java-Bali_header.jpg

Submarine cables, Java-Bali

The island of Bali has been suffering a constant shortage of power. PLN contracted a Consortium of PT. Boskalis International Indonesia, Sumitomo Corporation and J-Power Systems Corporation to procure and install two 150 kV submarine and underground interconnecting power cables to replace existing cables and to reinforce the link between the electricity grids on the Indonesian islands of Java and Bali.