Development gas export pipeline, Ichthys

The Ichthys development revolves around the construction of a new 42-inch deep sea natural gas pipeline from the Ichthys field in the Browse Basin 880 kilometers to Darwin onshore. The pipeline will run through the Darwin harbor, requiring dredging services in the near shore area, rock installation and the construction of a landfall. Owner INPEX Operations Australia Pty Ltd is developing LNG process facilities on Blaydin Point near Darwin, Northern Territory of Australia.

Boskalis’ scope of work for this project included:

Design & engineering 

Boskalis was responsible for the design of the trench slope based on the seabed and geophysical data available in each section. 

Shore approach construction

The shore approach works consisted of the following:

  • Setup of on shore site, including temporary access roads, lay down areas and office accommodation
  • Design, fabrication and installation of rollers inside the trench
  • Provision and installation of a 600 t socket passing linear winch
  • Provision and installation of a 3,300 m long pulling wire
  • Removal of 20x buoyancy modules from the pipeline
  • Rock installation and backfilling
  • Site reinstatement and rehabilitation

Pre-lay dredging

The pre-lay dredging works consisted of the following activities:

  • Shore crossing and near-shore dredging
  • Onshore dredge disposal
  • Near-shore dredge disposal
  • Stockpiling, disposal and treatment of acid sulphate soils
  • Plume monitoring

Rock supply and installation

The rock supply & installation works included the following activities:

  • Quarrying / procurement of rocks of specified grade
  • Transportation of rocks to Darwin Harbour temporary stockpile area
  • Load out of rocks onto offshore marine vessels
  • Rock installation

Survey and positioning

Boskalis was responsible for all survey and positioning services required for the onshore and offshore scope of work, including pre and post dredging surveys, shore pull wire as-laid survey, as laid pipeline surveys, as installed backfill and rock installation surveys and land site reinstatement surveys.

Related projects

Selected filters
Fleet_OE_Moho.jpg

Transport and installation Moho Nord FPU

For the Total Moho Nord FPU project, Dockwise has transported the newbuild FPU Likouf from the HHI fabrication yard in Ulsan, South Korea to the offshore discharge location near Port-Gentil, Gabon. It was a world-record cargo load onboard a semi-submersible vessel to date. 

Thien_Ung_I.jpg

Installation topside
and living quarters,
Thien Ung BK-TNG

For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

1407-0505-30_header.jpg

Development gas export pipeline, Ichthys

The Ichthys development revolves around the construction of a new 42-inch deep sea natural gas pipeline from the Ichthys field in the Browse Basin 880 kilometers to Darwin onshore. The pipeline will run through the Darwin harbor, requiring dredging services in the near shore area, rock installation and the construction of a landfall. Owner INPEX Operations Australia Pty Ltd is developing LNG process facilities on Blaydin Point near Darwin, Northern Territory of Australia.

140718_-_48.jpg

Wintershall RAVN and A6-A

Wintershall Noordzee B.V. installed a new remote platform RAVN as a crude production tie-back to A6-A. RAVN is a remote and unmanned crude well unit. Utilising a dry-tree design, all control, power and metered injection for the well will be via the 18.2-km control umbilical between the new satellite platform RAVN in the Danish sector and the operational platform A6-A in the German sector.

AT2C5860_header.jpg

Dry transport,
FPSO Armada Intrepid

The Armada Intrepid, which is owned by the Malaysian company Bumi Armada, is an FPSO (Floating Production, Storage and Offloading) vessel which needed to be dry transported from Rotterdam (Netherlands) to Batam (Indonesia) on the Dockwise Vanguard. The FPSO is 245 m long and weighs 60,000 metric tons. The DWV (275 x 70 m) has a deadweight of 117,000 metric tons.

ZP_-_pic4_header.jpg

Mooring replacement phase 2, Zafiro Producer

Mobil Equatorial Guinea Incorporated, an affiliate of ExxonMobil, entered into a contract with Boskalis for the Zafiro Producer Mooring Replacement Project Phase 2. The Zafiro Producer is installed in 180 m (590 ft)water depth approximately 74 km (40 nauticalmiles) west of Malabo, Equatorial Guinea.