NORDSTREAM II

Allseas Engineering had been awarded with the contract to support partly with construction of the offshore natural gas transmission system comprising two 48” diameter pipelines from Russia to the Baltic through Germany (NPSP2). The installation of the NSP2 pipeline has been performed by Charterers pipelay vessels: Solitaire, Pioneering Spirit and Audacia.

Boskalis was awarded by Allseas Engineeirng to perform anchor handling assistance and survey and ROV support during the pipelay work conducted by the PLV Audacia. The southern section of the two pipelines was installed by PLV Audacia without utilizing her DP system. This was a requirement from Charterers client and the vessel had therefore been fitted with 10 mooring spread to maintain position during the pipelay operation. The work was performed in German waters from Global KP point 1197 to 1159 – Country KP 17 – 55 in a water depth ranging from 17 to 25 m. This required anchor handlers above 150 Tonnes Bollard Pull which were capable of handling9 x 18mT Stevshark Rex anchors2 x 16mT Stevshark anchorsFurthermore Boskalis provided in-house survey and ROV equipment in order toPerform TDM (Touchdown monitoring) using a pole mounted MBES (multibeam echosounder)Perform TDM with the ROVCheck and confirm anchor catenaries using either MBES or ROV when requested by PLV Audacia. For this scope the 205TBP AHTS Union Manta was outfitted with survey and ROV equipment. Also dedicated shore support in Mukran was provided to ensure an efficient operation. With all Boskalis’ projects safety is an essential part. The project was executed with a good safety performance of the marine crew and project management. The marine spread was manned to perform 24/7 anchor handling and survey duties. Also dedicated shore support in Mukran was provided to ensure a efficient operation. The marine spread exceeded CLIENT’s expectations while maintaining the highest safety and sustainability standards, Boskalis through combining various inhouse disciplines and due to its diverse and large fleet size was able to provide an all round solution as requested by our client.

Related projects

Selected filters
Muuga_3_header.jpg

Expansion coal terminal, Muuga

The Muuga Coal terminal, sited on a bay, east of the existing port of Muuga, is to handle some five million tons of Siberian coal a year for destinations worldwide. The coal is shipped to Muuga by rail. Future developments may include container berths and steel facilities. The main contractor for the development of the Muuga coal terminal was the Estonian project management group A.S. Merko Ehitus. The dredging subcontract was awarded in late May 2003 to Terramare Eesti O.Ü., the Estonian arm of the Finnish-based Boskalis group company Terramare Oy.

29_Oct_04_D_isle__1__header.jpg

Construction drilling island and ice barriers, Kazakhstan

Agip Kazakhstan North Caspian Operating Company B.V. (Agip KCO), a consortium of eight leading oil companies, is active in the northern section of the Caspian Sea. The gas and oil reserves in this area were mapped out in 1998 and 1999. To allow for their exploitation, Boskalis International has created an artificial island measuring 225 x 225 meters, and underwater berms, for Agip KCO. Four years later, the time was ripe for the construction of the drilling island and ice barriers. Once they were in place, Agip KCO could start to extract and distribute the oil reserves.

Queen_Daya_Bay_300dpi_header.jpg

Port construction, Daya Bay

In Daya Bay, P.R. China, a USD 4.3 billion petrochemicals complex was being built by CNOOC and Shell Petrochemicals Company (CSPC). Daya Bay is located in the southwest of China, Huizhou Municipality, Guangdong Province. The project called for the construction of two marine facilities, one nearby the petrochemicals complex, the other one further offshore. Early 2004, the Boskalis International B.V. and Nanjing Changjiang Waterway Engineering Bureau (NCWEB) partnership commenced dredging for the CSPC Nanhai Petrochemicals project. Key requirement of the project was to preserve the sensitive environment in Daya Bay. Hydronamic, Boskalis’ own engineering consultancy, designed the required monitoring plan and took responsibility for its implementation.

luchtfoto_project.jpg

Creation artificial lagoon, Barcelona

Increasing or compensating nature is one of the challenges in modern infrastructural projects. Within the scope of the extension of the Port of Barcelona compensation was required for nature to be preserved. A natural reserve, south of the Port of Barcelona and north of the International Airport of Barcelona, had to be increased and was realized within the city limits of Prat de LLobregat by the use of the cutter suction dredger Para and its auxiliary equipment.

May_2004_header.jpg

Port development, Coega

The Coega port project - on Algoa Bay at the mouth of Coega River - is designed to act as a catalyst for regional economic development. The new port and its adjacent Industrial Development Zone, 20 km east of Port Elizabeth, are described as South Africa's largest infrastructural development scheme for a decade. 

LFH241124009_header.jpg

Cleanup petroleum harbor, Amsterdam

The Amsterdam Petroleum harbor on the North Sea Canal has been used for the storage and transshipment of oil products since its construction in 1887. Over many years routine operations and unchecked discharges resulted in severe contamination of the harbor.