To main content

Port expansion, Onne

In May 2011 Boskalis was awarded the project for the expansion of the Federal Lighter Terminal and Federal Ocean Terminal of the Onne Port Complex by Prodeco International Limited. The project entails the reclamation of approximately 200 ha with suitable materials from nearby borrow areas.

In the Port Harcourt area, the Onne Oil & Gas Free Zone is undergoing a massive expansion under the management of Intels & PRODECO. The facilities in Onne are for the oil & gas industry to serve as a supply base, warehousing, fabrication yards amongst other related activities. Furthermore there is a general container cargo port facility. For all sectors of activities there is a requirement for more space, more quaywall length, with sufficient deep water and more industrial areas are required. The present steps to increase capacity are well on their way, and both civil construction and dredging & reclamation activities are progressing well. Nigerian Westminster Dredging and Marine Ltd is in charge of and responsible for the dredging and reclamation activities. Two areas of each approximately 100 ha are to be reclaimed with sand coming from the Bonny River. For this project, the trailing suction hopper dredge Waterway was mobilized as well as the cutter suction dredger Jokra both owned by the Company. Moreover a whole range of auxiliary equipment was brought to site such as but not limited to bulldozers, hydraulic excavators, wheelloaders, survey vessel, tugboat and barges. The NWDM workshop on site is supporting all activities. The workforce of over 250 persons originates mainly from Nigeria. A lot of focus is always to work with the local communities to supply workforce and to train the workforce as well as to make sure the local communities are benefiting from the spin off from the works. Supplies, additional equipment hires and manpower are mainly arranged through the host communities as well as accommodation for the Nigerian workforce. In a short time frame of less than a year the works advanced well and a large quantity of of sand has been taken from the borrow areas to fill the complete the reclamation of the FLT area and the start the reclamation of the FOT area. The sand has been pumped ashore with utmost care for environment and the difficult subsoil conditions to avoid landslides or other disruptions. The quality control of the works, the settlement of the subsoil of the reclamation areas and the sand supplied was constantly monitored by our in-house geotechnical engineers. To execute the required geotechnical tests NWDM has its own geotechnical laboratory on site.

Related projects

Selected filters
DJI_0005__4_.JPG

Construction of greenfield port and breakwater for Dangote quays Lekki

The Dangote Group, owned by Aliko Dangote, is building Africa’s largest oil refinery and fertilizer plant in Lekki, 60 kilometers east of Lagos, Nigeria. To facilitate the import of out-of-gauge components and other materials required for construction activities, a port was constructed

P67.jpg

P67 FPSO Transportation

On behalf of Company Petrobras and Client COOEC, Boskalis executed the dry transportation of the P-67 FPSO in 2018 from the COOEC Qingdao yard in China to Rio de Janeiro in Brazil. The P-67 FPSO will produce 150,000 bpd and compress six million cubic meters of natural gas daily in the Lula North section of the Lula-Cernambi field in the Santos basin.

Harderwijk_Lorentzhaven__7__header.jpg

Redevelopment Waterfront, Harderwijk

Boskalis Nederland is involved in one of the largest redevelopment projects in the Netherlands. The Harderwijk Waterfront project involves the complete transformation of the lakeside area of this IJsselmeer town. The project covers a strip approximately six kilometers long, combining homes, work and recreation in a natural way. The Harderwijk Waterfront will generate a quality boost in many areas: quality of life, employment, traffic, tourism and the environment.

Pluit_City_Island-bird_eye_view.jpg

Artificial island
off the coast of
Jakarta, Indonesia

Boskalis has been awarded a contract by PT Muara Wisesa Samudra to design and construct an artificial island measuring 160 hectares off the coast of Jakarta, Indonesia. The work is part of the dredging and land development works for the new Pluit City. It will be executed in a joint venture with Van Oord.

Medium-Foto_1_-_artist_impression_nw_situatie_A1_afslag_met_spoorbrug__1_.jpg

Road enlargement motorway A1-A6, Diemen-Almere

The A1/A6 project is one of the five sub-projects for Rijkswaterstaat that are included in the upgrading of the road network linking Schiphol Airport, Amsterdam, and Almere (SAA). The total length of the SAA link is 40 kilometers. Boskalis, together with partners, is responsible for the section from the Diemen intersection to Almere, a distance of approximately 23 kilometers.

29-8-11_006_header.jpg

Port maintenance,
Açu Port

Açu Port in São João da Barra, Rio de Janeiro (Brazil) is one of the largest port-industry complex in Latin America. The port consists of two terminals: T1, an offshore terminal for handling iron ore and oil, and T2, an onshore terminal built around the inner navigation channel which accommodates offshore supply companies and will handle bauxite, general cargo and vehicles.