Refurbishment water station, Olero Creek

In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration Project (OCR) is a 70 million US$ construction and commissioning subcontract. The scope of work is the refurbishment and reinstatement of the North Water Station (NWS) and its hook up to the interconnecting piping at Olero Creek.

The scope involves fabrication, installation, transportation, testing, hook-up, commissioning and start-up. The Olero Creek facilities were vandalized during a period of civil unrest in 2003 and further detoriated the following years. The Olero Creek facilities are located in the Olero Creek Field in OML-49 lease and consist of:
  • The North Flow Station (NFS), including production separation and oil shipping; 
  • The North Water Station (NWS), including water treating and injection;
  • The North Compression Station (NCS), including gas compression and dehydration;
  • Quarters and Utilities Station (QUS), including accommodations, power generation and utilities.
The coordinates of the North Water Station (NWS) in the Olero Creek are:
  • Latitude: 05 degree 51 minutes 28.6811 seconds
  • Longitude: 05 degree 07 minutes 55.4051 seconds
These four gravity-based concrete barges are connected by Interconnecting Piping (ICP) along a bridge. The North Flow Station (NFS) together with a temporary production system called the Benin River Flow Station is transporting oil and water from Olero Creek to the CNL facilities at Escravos.
The Olero Creek facilities were vandalised during a period of civil unrest in 2003 and further deteriorated the years thereafter.  The subject contract covered the refurbishment of the North Flow Station (NFS) and the North Water Station (NWS).

NWDM General scope of work

The NWDM scope of work consisted of the refurbishment of existing equipment and installation of new equipment on the North Water Station (NWS) at the NWDM Merogun yard in Warri and the transportation, installation, hook-up, commissioning and start-up at the Olero Creek location on completion of the refurbishment works. The NWS is a concrete gravity based barge with dimension 51.92m x 24.44m x 4.27m. The barge arrived at the NWDM yard in December 2010.

Related projects

Selected filters
quarry.jpg

Pipeline survey and freespan correction, Bach Ho

The Bach Ho Gas Pipeline is located at the South Coast of Vietnam in the province of Vung Tau and comprises a 16" pipeline installed in 1994. The 16" pipeline is one of the main production lines of Petrovietnam Gas Company (PVGAS) and important for the supply of natural gas to electrical power plants, production and export of LPG and other domestic users.

Gas pipeline project, Trans Thailand Malaysia

The Trans Thailand Malaysia Gas Pipeline Project comprised the installation of a 34 inch concrete coated gas pipeline, running from the joint Thai-Malaysia development area approximately 270 kilometers offshore towards the southern Thai coast near Chana. As part of this project a contract was awarded to the Boskalis Offshore B.V. - Tideway B.V. consortium for the provision of the dredging and backfilling works, whereas Boskalis Offshore provided the main equipment and project support.

Taurus___BKM100_header.jpg

Shore approach and landfall works, Libyan gas transmission system

West Libya aimed to enhance its position in the supply of continental Europe's energy needs. As the demand for cleaner energy was rising and gas consumption in Italy wasexpected to increase, Libya and Italy found common ground for cooperation. Construction of a 700 million USD gas treatment plant in Mellitah was the centrepiece of this West Libya gas project. The Mellitah plant is supplied with gas from the desert Wafa field, 520 kilometers south-west of Tripoli, and from the offshore Bahr Essalam field, 110 kilometers north of Tripoli.

Seahorse_04_header.jpg

Glory hole excavation, White Rose

The White Rose offshore oil field is the third major oil field in the Jeanne d’Arc Basin on the Grand Banks, some 350 kilometers east of St. John’s, Newfoundland, Canada and within 50 kilometers from the Terra Nova and Hibernia fields. The South White Rose oil pool covers approximately 40 square kilometers and contains an estimated 200-250 million barrels of recoverable oil.

Woodside_3_header.jpg

Dredging and backfilling, TSEP

In order to increase the production capacity from the gas condensate fields located off the North West Coast of Western Australia, Woodside Energy Limited, on behalf of the North West Shelf JV Participants, has realized the installation of a multiphase subsea 42" pipeline. The new trunkline supplements an existing 40" pipeline, which conveys gas/condensate from the North West Shelf fields - North Rankin, Goodwyn and Cossack/Wanaea - to onshore treatment facilities located on the Burrup Peninsula near Dampier, Western Australia.

Beach_pull_at_Pulau_Pemping2_header.jpg

Seabed preparations, PGN

The pipeline between Pulau Pemping, Indonesia, and Pulau Sakra, Singapore, is the final link of the transportation system for natural gas from onshore fields on South Sumatra to Singapore. The successful completion of the Engineering, Procurement and Construction contracts for the 27-kilometers 28-inch gas pipeline with a 96-core fibre optic cable in one of the busiest ports and shipping traffic zones of the world marked a milestone for Boskalis. The scope of work comprised not only seabed preparations and protective rock berm installation - Boskalis Offshore core activities - but also pipeline manufacturing and installation.