To main content

Wintershall L8-P4

Wintershall Noordzee B.V. installed a new remote platform at L6-B as a gas production tie-back to L8-P4. L6-B is a remote and unmanned gas well unit. Utilising a dry-tree design, all control, power and metered injection for the two wells will be via the 19.5-km control umbilical between the new satellite platform L6-B and the operational gas platform L8-P4. 

The umbilical forms the entire link between the remote platforms, supplying and controlling all functions and ensuring continual feedback and monitoring of L6-B. The umbilical supplies all the necessary input data, control and feedback to eliminate the usual day-to-day requirement of direct human contact. The umbilical was installed from L8-P4 first end to second end pull-in at L6-B remote end. Both platforms are located in Dutch territorial waters in the North Sea. The umbilical was connected/pulled in to L6-B via a J-tube and internal conductor to the L6-B topside - TUTA. The umbilical will be installed from L8-P4 - first end with pull-in to topside deck via a J-tube, laid in corridor separate from the 8-inch pipeline between L8-P4 and L6-B.

FACTS AND FIGURES

  • Water depth 30-35 meters
  • Challenging North sea conditions.
  • Challenging soft seabed.
  • Fast-track project, with a short lead-time between award and installation – Feb 2014, July/Aug installed.
  • Stepped phase process of pull-in, laying and burial ops.
  • Completed on time, with no incidents.
  • Umbilical loaded quickly and safely.
  • Umbilical length 19.5 km.
  • Burial scope of single pass burial of umbilical minimum requirement of 1m TOC (top of cover).

SCOPE OF WORK

  • Prepare project planning for Boskalis’ scope of work.
  • Survey work, including a pre-burial, as-laid and post-burial survey.
  • Perform route engineering and installation engineering to optimize the performance of the installation scope, including a detailed burial assessment study (BAS).
  • Prepare platform on L8-P4 and L6-B.
  • Define umbilical length together with the client.
  • Umbilical load-out at DUCO Newcastle (UK) onto the installation vessel Ndurance.
  • Hang-off of umbilical end.
  • Crossing 36-inch live gas pipeline Callantsoog.
  • Pull-in at L6-B & L8-P4 platforms – direct from vessel as part of SIM-OPS.
  • Mobilize and demobilize all installation spreads for Boskalis’ scope.
  • Provide engineering support during the offshore umbilical installation, including burial.
  • Provide QHSE management for Boskalis’ scope.

Related projects

Selected filters
TSHD_Barent_Zanen_backfilling_at_Denia_header.jpg

Landfall construction
Balearic submarine pipeline

As part of its network expansion program, Enagas undertook the installation of a submarine pipeline providing natural gas from the Spanish mainland to the Balearic Islands of Ibiza and Mallorca, integrating them into the Spanish gas system. This 20" nominal diameter pipeline was constructed in two distinct sections, one of 123 km between the mainland and Ibiza and another of 146 km between Ibiza and Mallorca.

Baydaratskaya_Bay.jpg

Installation gas pipeline, Baydaratskaya Bay

The Baydaratskaya Bay Project is located in the Kara Sea in the North of Russia. The Kara Sea is bordered on its western side by Novaya Zemlya and on the east by the North Siberian Coast. Baydaratskaya Bay is located in the south of the Kara Sea between the Ural Coast and the Yamal Peninsula. Yamalgasinvest (Gazprom) is planning the construction of four pipelines and two cable crossings at Baydaratskaya Bay for the exploitation of the Bovanenkova and Harasawejskoje gas field on the Yamal Peninsula.

DPFV_Seahorse_moors_for_loading_header.jpg

Free span rectification gas pipeline, East Java

The existing live 28" East Java Gas Pipeline runs offshore from the Kangean Block, close to Pagerungan Besar Island, Kangean Islands, Indonesia, through the Madura Strait and onshore via Porong to Surabaya, Indonesia’s second largest city.

DSC01999_header.jpg

Development LNG field, Snøhvit

The Snøhvit development comprises three fields – Snøhvit, Albatross and Askeladd. These are located in the Barents Sea, about 140 kilometers north-west of Hammerfest in northern Norway. All primarily contain natural gas with small quantities of condensate. Snøhvit is the first major development on the Norwegian continental shelf without surface installations.

Installation_of_cofferdam_to_enable_trench_excavation_through_surf_zone_header.jpg

Crude oil unloading facilities, Sri Racha

Thai Oil Public Company Limited is the largest petroleum oil refiner and supplier in Thailand. To enable Very Large Crude Carriers (VLCC) up to 320,000 DWT or a freight capacity of up to two million barrels to berth at Thai Oil's refinery in Sri Racha, Chonburi Province, a second Single Buoy Mooring (SBM) facility was installed approximately 14 km offshore, in water depths of around 30 m. From this buoy, a 52' diameter concrete coated steel pipeline had to be installed to the landfall location near the Thai Oil refinery.

Installation gas pipeline, Balgzand-Bacton

BBL Company was established to design, construct, operate and exploit the Balgzand-Bacton Pipeline (BBL) for the transmission of natural gas from Balgzand, the Netherlands to Bacton in the United Kingdom. The overall length of the 36" offshore pipeline is some 230 kilometers. The capacity is around 42 million m3 of gas a day. As part of the pipeline installation, Saipem UK Ltd awarded Boskalis Offshore the contracts for the shore approaches at Julianadorp, the Netherlands and Bacton in the United Kingdom and the presweeping and rock dumping works along the pipeline route on the North Sea.