To main content

Activities

We have expanded our activities from our traditional dredging-related operations, which include the construction and maintenance of ports and waterways, land reclamation, coastal defense and riverbank protection. Today, Boskalis also offers a wide variety of marine services and contracting to the offshore energy sector. In addition, we provide emergency response and salvage through SMIT and terminal services through Smit Lamnalco.

Dredging_infra_coastal_defense_reclamation_2_01.jpg

Dredging & Inland Infra

Our dredging activities include port construction and maintenance, land reclamation, coastal defense and riverbank protection. We also operate as a contractor of dry infrastructure projects.

Transport Anchor Hull

Offshore energy

We are involved in the development, construction, maintenance and decommissioning of oil and LNG import/export facilities, offshore platforms, cables and pipelines, and offshore wind farms.

Salvage_wreck_removal_heavy_lift.jpg

Salvage

We provide assistance to vessels in distress, wreck removal and salvage related services, including environmental care.

Our activities

Boskalis realizes complex projects on time and within budget even in difficult locations. We are renowned for our innovative approach, progressive safety program and environmentally friendly techniques.

Project overview

vuosaari_1_header.jpg

Port construction, Vuosaari

Vuosaari Harbor is the most significant harbor project in Finnish history; in fact, it is unique even on a European scale. Both existing harbors in Helsinki’s city centre are being transferred to the eastern outskirts of the city. They are being replaced with a harbor with excellent traffic connections that can meet the increasing demand for cargo handling. The Vuosaari Harbor Center will provide a competitive and modern service package, with smooth connections between harbor operations and other logistical facilities. The harbor center will comprise the gate area, the closed harbor area and the adjacent Business Parks. The fairway to the Harbor Center will be 32 km long, at least 200 m wide, and 11 m deep. The port area comprises 150 ha, of which 90 ha will be land reclaimed from the sea.

Installation_of_cofferdam_to_enable_trench_excavation_through_surf_zone_header.jpg

Crude oil unloading facilities, Sri Racha

Thai Oil Public Company Limited is the largest petroleum oil refiner and supplier in Thailand. To enable Very Large Crude Carriers (VLCC) up to 320,000 DWT or a freight capacity of up to two million barrels to berth at Thai Oil's refinery in Sri Racha, Chonburi Province, a second Single Buoy Mooring (SBM) facility was installed approximately 14 km offshore, in water depths of around 30 m. From this buoy, a 52' diameter concrete coated steel pipeline had to be installed to the landfall location near the Thai Oil refinery.

Mighty_Servant_3_-_2006_1_header.jpg

Salvage operation, Mighty Servant 3

In the morning of 6 December 2006 semi submersible vessel Mighty Servant 3 developed a list and sank off the port of Luanda, Angola, after the offloading of drilling platform Aleutian Key. The vessel was resting at the sea bottom in approximately 52 meters of water.

AA_hoofdfoto_header.jpg

Dredging, reclamation,
reconstruction and environmental
monitoring works, Vilufushi

The Republic of the Maldives consists of 1,190 small coral islands grouped into 26 atolls. Only 200 islands are inhabited. On 26 December 2004, a tsunami originating from Indonesian waters struck the Maldives. This natural disaster had major economic, social and environmental consequences. Of the 200 inhabited islands, 13 were totally destroyed and 56 suffered major damage, including the island of Vilufushi in Thaa Atoll. Houses and infrastructure were heavily damaged. All the surviving residents had to be evacuated to the neighboring island of Buruni to the west of Vilufushi. The government of the Maldives decided to reconstruct the entire island and to extend it considerably by landfilling the shallow reef. Boskalis International was appointed for this work.

HL_Stralsund_header.jpg

Bridge construction, Stralsund

SMIT’s 1,200 tonnes sheerlegs Taklift 7 completed a major German bridge building programme during 2006. The sheerlegs had spent several months at the new Stralsund Bridge, on the German Baltic coast. This suspension bridge links the mainland with the island of Rügen.

2007-02-22_header.jpg

Land reclamation, Half Moon Bay Island Manama

‘Half Moon Bay’ island is situated in the Seef area of Manama in the Kingdom of Bahrain. The purpose of the island is to accommodate a future 5 Star Hotel development as well as several villas. Engineering Department Hydronamic was engaged to develop the design of the island and to provide advisory services to Boskalis Westminster Middle East. Through good co-operation between the design engineers of Hydronamic and the construction team of Boskalis Westminster Middle East innovative ideas were developed which could be integrated into the rock protection design resulting in the successful and efficient construction with significant cost savings to the project.

Fleet and equipment

Find out more about our fleet and equipment

More about Boskalis

Organizational structure

An overview of Boskalis’ organizational structure including board of management, supervisory board, divisional structure and offices.

Fleet and equipment

Boskalis has an extensive and versatile fleet of around 600 vessels which can be deployed in the optimal configuration for each project.

Careers

If you are interested in finding out more about what it is like to work for us, take a look at our dedicated Careers website. Here you will find our current vacancies, information about our traineeships, and much more.