To main content

Inland ports
and waterways

Boskalis designs, builds and maintains inland ports and waterways. We construct channels and canals, quay walls, locks and sluices. We also offer solutions to combat high river water levels and the effects of severe rainfall. Options include widening rivers, creating secondary channels, upgrading dikes, constructing overflow areas and creating new areas for nature.

Creating cost-effective opportunities

Boskalis specializes in creating opportunities for inland ports and waterways. Costs are always crucial in any large infrastructure project. Our team of specialists not only carefully assesses your project’s economic feasibility and potential risks. We also identify the opportunities – such as re-using dredged material for building material, or to create new recreation and nature areas.

Our inland ports and waterway solutions

inland_ports.jpg
1
Suez-proefvaart_3.jpg

Channels and canals

Design, construction and maintenance.

2
RWS140517TF065.jpg

Acqueducts, bridges and sluices

Design, construction and maintenance.

3
waterfront_1409_9_Fotor.jpg

Inland ports

Design, construction and maintenance.

4
finland-vuosaari-quay-walls.jpg

Quay walls

Design, construction and maintenance.

5

Channel

Construction of a channel.

6
Shore_protection_new.jpg

Shore protection

Design, construction and maintenance.

Our projects

Selected filters
37ac96e429c252fd55f1136ce6374c9e_image_header.jpg

Early works for LNG plant, Brass Island

The Brass LNG Project’s objective is to construct a LNG Complex on Brass Island, Bayelsa State, Nigeria, and in so doing, develop Nigeria’s abundant gas resources, reduce the adverse effect of gas flaring on the environment, and provide social-economic benefits to the local and wider Nigerian communities. The LNG complex will be designed to produce approximately 10 million tons per annum (MTPA) of LNG, as well as LPG and Residual NGL products.

_HP_0356_header.jpg

Dredging and reclamation, Port of Peterhead

The project consisted of capital dredging, reclamation, quay construction and breakwater extension works for Peterhead Smith Embankment Development, in order to develop the area in the north of the harbour at Smith Embankment to provide sheltered berths for vessels ranging from 20 to 160 m in length.

Loading_TSHD_by_CSD_header.jpg

Creation bird island, Le Havre port 2000

Le Havre is the fifth largest container port in Europe and is expanding its facilities: the current 14 quays for container vessels are to be expanded with another 12 (all outside the locks). Port 2000’s rationale centres on Le Havre’s determination to position itself as a leading hub.

Balboa_2_header.jpg

Port expansion, Balboa

The plans to expand the Panama Canal represent one of the most important infrastructure improvements of the 21st century. Since its opening in 1913 the Canal has provided the shortest and most economically viable shipping route from Pacific to Atlantic seaports. With the ever-increasing size of modern-day vessels, it was inevitable that the Canal would need to be widened and deepened. The expansion of the Canal has made the extension of the Port of Balboa at the mouth of the canal on the Pacific Ocean a necessity. The Phase 4 projects included Marine Works and Civil Works to improve two existing berths and to build a completely new berth capable of handling not only Post Panamax but also Super Post Panamax ships.

DSCF0226_header.jpg

Land reclamation, North Manama Causeway

The purpose of the project was to provide additional land to accommodate a section of a proposed new highway system to service the area and to relieve congestion on the corniche road. Boskalis appointed Hydronamic (the in-house engineering department of Boskalis) to provide detailed design and on site assistance with supervision of the sub-contractor for the rock works.

Oman_-_the_Wave_I_header.jpg

Reclamation, dredging and excavation, The Wave

Through Orascom, the Omani government is developing their tourist and real estate sector in order to diversify its economical drivers. The Wave, Muscat is the first freehold tourism and residential development to be launched in the Sultanate of Oman. The USD 805 million project will stretch along 7 kilometers (4.35 miles) of beachfront land overlooking the Gulf of Oman and covers an area of approximately 2.5 million square meters (26.9 million square feet). It is located in Muscat, Oman's capital city, about 5 kilometers (3.1 miles) from Muscat’s Seeb International Airport.

More infra solutions

Land reclamation

Boskalis reclaimes land, improves soil, protects shorelines and realizes coastal contruction projects.

Coastal protection

Boskalis constructs traditional hard sea defenses and innovative soft sea defenses.

Environmental services

Boskalis provides a broad range of environmental services including remediation of contaminated land and dredged sediment.

Roads and railways

Boskalis develops, supervises and realizes multidisciplinary road and railway projects.

Tunnels and bridges

Boskalis designs, develops and constructs bridges and tunnels, providing solutions covering the entire process.