Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.

Tetra Tech was commissioned by the Fox River Cleanup Group as the lead contractor for the remediation and its responsibilities include water treatment and coordination of transportation and disposal of all residual streams. The dredging work is being carried out by local dredger J.F. Brennan, while Stuyvesant Environmental Contracting Inc. (SECI), the North American arm of Boskalis Environmental, is processing the contaminated sediments.

Within a period of 12 months, SECI designed and built a plant to process almost three million m3 of contaminated sediment from the Fox River. Never before has a plant like this been built in such a short space of time. The plant processes the dredged sediments into clean sand and dewatered sludge cake.

Another unique aspect of the project is the integrated approach, with all the steps - dredging, processing and disposal - being combined in a single process.
The harsh winters in this region mean that the plant can only operate for about seven months of the year. Nonetheless, the remediation work got off to a successful start in April 2009 and the project is expected to reach completion as scheduled in 2016.
 

Key figures for the plant:

  • 200 m3 per hour in situ capacity
  • 8 membrane filter presses with a capacity of 18 m3 each
  • 9,000 m2 for sand separation and mechanical dewatering
  • 3,250 m2 for rubble and sand storage
  • 7,800 m2 for sludge cake storage
  • 1,000 m3 storage tank capacity (two units)

Related projects

Selected filters
Large-12_overige_financiele_ontwikkelingen.jpg

Cieg GJ1 Cable repair

Channel Islands Electricity Grid, a joint venture between Jersey Electricity and Guernsey Electricity operate several interconnecting power cable systems (power and telecom) between Jersey, Guernsey and France. Both Jersey and Guernsey rely upon the services of these interconnecting power cables and as a consequence there is a demand to reduce the possible effects and impact of failure to these interconnecting power cables. Boskalis were contracted to conduct a preemptive repair replacing a section of cable including the installation two subsea joints on the Guernsey Jersey circuit, close to Havelet bay.

hires-6917.jpg

Construction motorway, A4 Delft-Schiedam

Boskalis Nederland was involved in the construction of the A4 motorway from Delft to Schiedam. The client is Rijkswaterstaat. After 40 years, the construction of this final section will bring to an end the public debate about whether this new road was needed.

Boskalis_Suezkanaal_cutter_suction_dredgers_4153_header.jpg

Channel expansion, Suez

The Suez Canal is one of the world’s main shipping links and thus of major importance to world trade. The canal extends from Suez on the Red Sea to Port Said on the Mediterranean. Egypt’s Suez Canal Authority awarded the contract to double the canal’s capacity to a consortium, which was aptly named the Challenge Consortium by the Chairman of the Suez Canal Authority, Admiral Mohab Mamish.

DSC_0008_header.jpg

Onshore co-mining project, Lelydorp

Suralco L.L.C., an indirect joint subsidiary of Alcoa Inc. and Alumina Ltd., has awarded Boskalis a contract for the mining of bauxite in Lelydorp, Suriname. Boskalis is responsible for the entire mining process, from engineering and overburden removal to bauxite mining and ore delivery.

Picture_6_header.jpg

Port development, Cherbourg

To accommodate an assembly plant for wind turbines, a 220 m quay wall had to be added to the existing quay and two hectares of land behind the new quay had to be reclaimed.

P1030713_header.jpg

Dredging and reclamation, Songdo International City

Boskalis has been awarded a contract by Daewoo E&C for the dredging and reclamation of new land for Songdo International City on the waterfront of Incheon, South Korea. The total value of the contract amounts to approximately EUR 80 million.