Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.

Tetra Tech was commissioned by the Fox River Cleanup Group as the lead contractor for the remediation and its responsibilities include water treatment and coordination of transportation and disposal of all residual streams. The dredging work is being carried out by local dredger J.F. Brennan, while Stuyvesant Environmental Contracting Inc. (SECI), the North American arm of Boskalis Environmental, is processing the contaminated sediments.

Within a period of 12 months, SECI designed and built a plant to process almost three million m3 of contaminated sediment from the Fox River. Never before has a plant like this been built in such a short space of time. The plant processes the dredged sediments into clean sand and dewatered sludge cake.

Another unique aspect of the project is the integrated approach, with all the steps - dredging, processing and disposal - being combined in a single process.
The harsh winters in this region mean that the plant can only operate for about seven months of the year. Nonetheless, the remediation work got off to a successful start in April 2009 and the project is expected to reach completion as scheduled in 2016.
 

Key figures for the plant:

  • 200 m3 per hour in situ capacity
  • 8 membrane filter presses with a capacity of 18 m3 each
  • 9,000 m2 for sand separation and mechanical dewatering
  • 3,250 m2 for rubble and sand storage
  • 7,800 m2 for sludge cake storage
  • 1,000 m3 storage tank capacity (two units)

Related projects

Selected filters

Shell Malikai

Malikai is a deepwater oil discovery in offshore Sabah, Malaysia where Sabah Shell Petroleum Company is the designated Operator. A floating Dry Tree Unit (DTU) will be installed over Malikai field utilizing a Tension Leg Platform (TLP) design that suits the Malikai environment.

FF66817_header.jpg

Coastal development, Hondsbossche and
Pettemer Sea Defense

A joint venture of Boskalis Nederland and Van Oord has been commissioned by the Hollands Noorderkwartier water control board to reinforce the Hondsbossche and Pettemer Sea Defense between the villages of Petten and Camperduin on the coast of the Dutch province of Noord-Holland.

Cornelis_Zanen.jpg

Maintenance dredging, Yangon River

Located close to the city centre on the Yangon River, Yangon Port has been the main port to Myanmar since colonial times. Currently, the port has capacity for vessels of up to 15,000 –20,000 DWT and works are scheduled to increase the port’s capacity for vessels up to 35,000 DWT.

Gabon_Libreville1920.jpg

Port development,
Libreville - Gabon

A new area was constructed in the Port of Libreville for a mineral terminal, dry dock, fishing port, processing facilities and other port activities, such as aggregate processing. This new port development was required to improve and strengthen the logistic capacity for the inland mining industry, to reduce export costs, and thus to increase the competitiveness of mineral exports from Gabon.

Butendiek OWF

Boskalis was contracted by OWP Butendiek GmbH & Co. KG to supply, install and protect (by post-lay burial) the high-voltage inter-array cable at the offshore wind farm of Butendiek. This German wind farm is situated in the German Bight (Nordsea), approx. 35 km west of the island of Sylt. The 33 km2 wind farm consists of 80 wind turbines with a capacity of 3.6 MW each and a total capacity of 288 MW. The inauguration of the wind farm took place on September 8, 2015. It provides renew-able energy to approx. 370,000 households.

IMG_3549_header.jpg

Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.