Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.

Tetra Tech was commissioned by the Fox River Cleanup Group as the lead contractor for the remediation and its responsibilities include water treatment and coordination of transportation and disposal of all residual streams. The dredging work is being carried out by local dredger J.F. Brennan, while Stuyvesant Environmental Contracting Inc. (SECI), the North American arm of Boskalis Environmental, is processing the contaminated sediments.

Within a period of 12 months, SECI designed and built a plant to process almost three million m3 of contaminated sediment from the Fox River. Never before has a plant like this been built in such a short space of time. The plant processes the dredged sediments into clean sand and dewatered sludge cake.

Another unique aspect of the project is the integrated approach, with all the steps - dredging, processing and disposal - being combined in a single process.
The harsh winters in this region mean that the plant can only operate for about seven months of the year. Nonetheless, the remediation work got off to a successful start in April 2009 and the project is expected to reach completion as scheduled in 2016.
 

Key figures for the plant:

  • 200 m3 per hour in situ capacity
  • 8 membrane filter presses with a capacity of 18 m3 each
  • 9,000 m2 for sand separation and mechanical dewatering
  • 3,250 m2 for rubble and sand storage
  • 7,800 m2 for sludge cake storage
  • 1,000 m3 storage tank capacity (two units)

Related projects

Selected filters
8620740517_e75a0d7703_o_1__header.jpg

Reinforcing Dutch
coastline, Sandmotor

In December 2010 Royal Boskalis Westminster N.V. was awarded a contract by the Dutch Directorate General for Public Works and Water Management to reinforce part of the coastline in the province of Zuid-Holland by creating a ‘sand engine’. The total value of the contract is EUR 50 million for the Van Oord- Boskalis consortium, in which Boskalis has a 50% stake.

IMG_1101_header.jpg

Port expansion LNG terminal, Cuyutlán

The Mexican Ministry of Communications and Transport awarded Royal Boskalis Westminster N.V. two contracts for dredging an access channel and turning basin at the Cuyutlán liquefied natural gas import terminal on the west coast of Mexico.

Oranje___CDF_31Oct11__2__-_aangepast_header.jpg

Design and construction harbor channel, Sydney harbor

The 'Sydney Harbor Channel Dredging Project' in Nova Scotia, Canada, involved dredging and reclamation work as part of the construction of the new Sydney Port container terminal located on the northeast coast of Canada. Once operational, Sydney Port will be the most northerly deepwater container terminal on the North American east coast.

9CHP0243_header.jpg

Port construction,
Khalifa port

The Khalifa Port and Industrial Zone (KPIZ), one of the world’s largest greenfield development projects, is part of Abu Dhabi’s major diversification plan to develop various sectors such as property, tourism, infrastructure and others. Abu Dhabi’s main existing port, Mina Zayed, is hemmed in by Abu Dhabi city, limiting its accessibility and the possibility for expansion.

edax_aroima_copy_header.jpg

Maintenance dredging, Berbice River

One of Guyana’s major export products is bauxite, which originates from the Aroaima, Kwakwani and Ituni regions around the Demerara and Berbice rivers in north-eastern Guyana. Guyana annually exports approximately 2.2 million tons of bauxite from it’s mines along the Berbice River. Boskalis International has long been associated with the mining industry in Guyana. In 1990 a long-term overburden removal project for the Aroaima mine was begun in Guyana involving the dredging and disposal of a sand and clay layer of 30-45 meters thickness.

CHP10918_header.jpg

Port reconfiguration, Felixstowe

Capital dredging and filling works for new quay development (previously known as Landguard Redevelopment). Phase 1 of the reconfiguration programme consists of: 730 m new deep water quay and 200,000 m2 container handling area achieved by installing new quay in front of old Landguard port structures and redevelopment of the old Landguard terminal.