Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.

Tetra Tech was commissioned by the Fox River Cleanup Group as the lead contractor for the remediation and its responsibilities include water treatment and coordination of transportation and disposal of all residual streams. The dredging work is being carried out by local dredger J.F. Brennan, while Stuyvesant Environmental Contracting Inc. (SECI), the North American arm of Boskalis Environmental, is processing the contaminated sediments.

Within a period of 12 months, SECI designed and built a plant to process almost three million m3 of contaminated sediment from the Fox River. Never before has a plant like this been built in such a short space of time. The plant processes the dredged sediments into clean sand and dewatered sludge cake.

Another unique aspect of the project is the integrated approach, with all the steps - dredging, processing and disposal - being combined in a single process.
The harsh winters in this region mean that the plant can only operate for about seven months of the year. Nonetheless, the remediation work got off to a successful start in April 2009 and the project is expected to reach completion as scheduled in 2016.
 

Key figures for the plant:

  • 200 m3 per hour in situ capacity
  • 8 membrane filter presses with a capacity of 18 m3 each
  • 9,000 m2 for sand separation and mechanical dewatering
  • 3,250 m2 for rubble and sand storage
  • 7,800 m2 for sludge cake storage
  • 1,000 m3 storage tank capacity (two units)

Related projects

Selected filters
IMG_0619_header.jpg

Port expansion, Gijón

The Spanish port of Gijón on the Bay of Biscay processes more than 12 million tonnes of bulk goods annually. With the expansion of global trade and increasing ship sizes, the terminal was lacking capacity to handle the traffic. The maximum draft for the ships of 18 meters is another obstacle to the development of the port. So the Port Authority of Gijón developed a plan for additional modern facilities in an area measuring 145 hectares to the north of the existing port. This includes a bulk terminal with a transfer capacity of more than 25 million tons and a storage area measuring 60 hectares for a maximum of 2 million tons of coal and iron ore a year.

5_Phase-2_header.jpg

Port development, Sevilla

Seville is located 80 km land inwards and it is Spain’s only commercial river port. Access is along the Rio Guadalquivir. The current dimensions and depth of the port impose limitations on the breadth and draughts of the vessels that use it, putting the future of the port at risk. So the Port Authority developed a New Maritime Approach that provides for the deepening and widening of the approaches to the port.

fremantle_1_header.jpg

Port expansion, Fremantle

Fremantle Ports is the Western Australian Government trading enterprise responsible for strategic management of the Port of Fremantle. The Port of Fremantle provides modern deep-water facilities for handling container trade, break-bulk vessels, livestock exports and motor vehicle imports as well as accommodating cruise ships.

IMGP4086.jpg

Extension cruise
terminal, the Bahamas

In April 2009 Royal Boskalis Westminster N.V. was awarded the contract for the extension of the cruise terminal in Nassau from the Ministry of Works and Transport of the Government of the Bahamas. The contract was worth approximately USD 44 million and the project was completed in the first six months of 2010.

_HP_0356_header.jpg

Dredging and reclamation, Port of Peterhead

The project consisted of capital dredging, reclamation, quay construction and breakwater extension works for Peterhead Smith Embankment Development, in order to develop the area in the north of the harbour at Smith Embankment to provide sheltered berths for vessels ranging from 20 to 160 m in length.

24012008_PLUTO_CSD_Phoenix__Samson_101_header.jpg

Dredging and construction, Pluto LNG project

The Pluto LNG project is located about 190 km northwest of the coastal town Karratha, in the Northern Carnarvon Basin, Western Australia. The project is a joint venture between Woodside Burrup Pty. Ltd., the operator, with a 90% interest, and Tokyo Gas (5%) and Kansai Electric (5%). The A$12 bn project will process gas from the Pluto and neighboring Xena gasfields.