Development gas export pipeline, Ichthys

The Ichthys development revolves around the construction of a new 42-inch deep sea natural gas pipeline from the Ichthys field in the Browse Basin 880 kilometers to Darwin onshore. The pipeline will run through the Darwin harbor, requiring dredging services in the near shore area, rock installation and the construction of a landfall. Owner INPEX Operations Australia Pty Ltd is developing LNG process facilities on Blaydin Point near Darwin, Northern Territory of Australia.

Boskalis’ scope of work for this project included:

Design & engineering 

Boskalis was responsible for the design of the trench slope based on the seabed and geophysical data available in each section. 

Shore approach construction

The shore approach works consisted of the following:

  • Setup of on shore site, including temporary access roads, lay down areas and office accommodation
  • Design, fabrication and installation of rollers inside the trench
  • Provision and installation of a 600 t socket passing linear winch
  • Provision and installation of a 3,300 m long pulling wire
  • Removal of 20x buoyancy modules from the pipeline
  • Rock installation and backfilling
  • Site reinstatement and rehabilitation

Pre-lay dredging

The pre-lay dredging works consisted of the following activities:

  • Shore crossing and near-shore dredging
  • Onshore dredge disposal
  • Near-shore dredge disposal
  • Stockpiling, disposal and treatment of acid sulphate soils
  • Plume monitoring

Rock supply and installation

The rock supply & installation works included the following activities:

  • Quarrying / procurement of rocks of specified grade
  • Transportation of rocks to Darwin Harbour temporary stockpile area
  • Load out of rocks onto offshore marine vessels
  • Rock installation

Survey and positioning

Boskalis was responsible for all survey and positioning services required for the onshore and offshore scope of work, including pre and post dredging surveys, shore pull wire as-laid survey, as laid pipeline surveys, as installed backfill and rock installation surveys and land site reinstatement surveys.

Related projects

Selected filters
Seahorse_-_Nord_Stream_2032010_header.jpg

Trench dredging gas pipeline, Nord Stream

The Nord Stream gas pipeline project is a joint project of four major companies: Gazprom, BASF/Wintershall, E.ON Ruhrgas and Gasunie. The project is more than just a pipeline. It is a new channel for Russian natural gas exports and a major infrastructure project which is expected to set a new benchmark in EU-Russia cooperation. In view of current developments the new pipeline will be an important factor of energy security in Europe.

D1107-1233_header.jpg

Seabed preparatory works,
Dana Medway

Dana Petroleum Netherlands B.V. is the operator of the Pllb De Ruyter field and oil-producing platform located in the Dutch section of the North Sea.

DPFV_Sandpiper_accompagnied_by_SMIT_tugs_on_her_way__to_worksite_header.jpg

Rock installation, PDET

In 2008 Boskalis was approached by Petrobras to carry out a rock installation project at the oceanic terminal, one of Petrobras’ offshore oil production locations. The terminal, situated at Campos Basin offshore Rio de Janeiro, Brazil, is a maritime complex consisting of one Independent Re-pump Platform (PRA-1), two monobuoys and a FSO vessel which links to a 20 inch gas pipeline system.

Belwind_1_bewerkt_header.jpg

Construction wind farm, Belwind

SMIT sheerlegs Taklift 4 installed the final element for one of Belgium’s first offshore wind farms, Belwind, the wind farm’s high voltage transformer substation. SMIT also provided the transport of the element and other marine support services to assist the construction of the wind farm.

Walney_wind_farm_UK_support_installatie_monopiles_windmolens_header.jpg

Offshore wind farm, Walney

Windfarm construction projects regularly feature in the work programmes of SMIT’s sheerlegs fleet. For example, the Taklift 7 was involved in the Walney Offshore Windfarm development in the Irish Sea. Walney Offshore is a wind farm project developed by DONG in the Irish Sea, some 20 miles from the coast at Barrow.

Magellan_4_header.jpg

Pipeline crossing, Strait of Magellan

The project involved the construction of a new, strategically important, 24" natural gas pipeline across the Strait of Magellan, linking Cabo Espíritu Santo in Tierra del Fuego province with Cabo Vírgenes in Santa Cruz province. The new pipeline was built as an expansion of the existing San Martín pipeline in an effort by the government to increase gas supplies from Tierra del Fuego to the Argentinian mainland.