The Khalifa Port and Industrial Zone (KPIZ), one of the world’s largest greenfield development projects, is part of Abu Dhabi’s major diversification plan to develop various sectors such as property, tourism, infrastructure and others. Abu Dhabi’s main existing port, Mina Zayed, is hemmed in by Abu Dhabi city, limiting its accessibility and the possibility for expansion.

The new Khalifa Port, located 4.6 km offshore, is built on an artificial island (Port Island) with a separate berth island (for Emirates Aluminum). These islands are connected to the mainland by causeways and bridges. Khalifa Port is scheduled to replace Mina Zayed by late 2012 and provides infrastructure for a wide range of industrial and commercial activities in Abu Dhabi. When completed, the first phase of Khalifa Port will handle 2 million TEUs, four times the capacity of Mina Zayed. In June 2007 the Khalifa Port Marine Consortium (KPMC) was formed with partners Boskalis Westminster Middle East Ltd., Archirodon Construction and Hyunday Engineering & Construction. In October 2007 KPMC was awarded a multi-faceted design, procurement and construction contract. The specified work included dredging of an access channel and port basin, land reclamation, rock protection works, breakwaters and quaywall construction, to be performed by the Consortium in which Boskalis had a 43% share. When the contract was awarded, most of the final Khalifa Port and Industrial Zone (KPIZ), Abu Dhabi design work for the port’s construction had yet to be done. The client – Abu Dhabi Ports Company (ADPC) – sought contractors with the skills and multidisciplinary services able to deliver design expertise as the operations progressed. Boskalis engineers from the inhouse company Hydronamic coordinated the design activities, not only in the dredging and reclamation works, but also in the rock protection works, breakwaters and construction of the quay walls, bridges and breakwaters.

Related projects

Selected filters
DSC03484_header.jpg

Cleanup, Westergasfabriek

The Westergasfabriek was built by the British firm Imperial Continental Gas Association (ICGA) in 1883, and was at the time the biggest coal-fired gas factory in Amsterdam. The project site, covering four hectares, housed coal storage yards, gasometers, purification plants, a water tower and office buildings, all designed by the famous Dutch architect Isaac Gosschalk. The municipal energy company used the site for storage into the early 1990s.

Bahrain_header.jpg

Land reclamation, Shaikh Khalifa Bin Salman Causeway

The Shaikh Khalifa Bin Salman Causeway is located in the State of Bahrain in an expanse of water called the Khawr Al Qulayah. It connects the Hidd Drydock Highway to the Mina Sulman Port. This major infrastructure project is carried out in advance of the planned expansion of the Bahrain port activities. This New Port project is planned at the Hidd side and via the Shaikh Khalifa Bin Salman Causeway direct connected with the existing Mina Sulman port and Saudi Arabia. The total length of the Shaikh Khalifa Bin Salman Causeway is approximately 6,500 m, including a bridge of 400 m, which was constructed in 2000.

Oresund.jpg

Tunnel construction Øresund, Denmark - Sweden

The Øresund Tunnel forms part of the Øresund Link that connects the cities of Copenhagen in Denmark and Malmö in Sweden across the Øresund.

Chek_Lap_Kok__09-06-1995.jpg

Land reclamation Check Lap Kok airport Hong Kong

In 1996 Hong Kong was a modern city-state with almost 6 million inhabitants where air traffic was a very important component for economic activity. The old airport Kai Tak, with a single runway, was no longer able to cope with the growing number of passengers and amount of freight.  The authorities decided to build a new, bigger airport at a new location in Hong Kong, a 350 hectares hilly island off the coast about 28 km west of the city center.