Port construction,
Khalifa port

The Khalifa Port and Industrial Zone (KPIZ), one of the world’s largest greenfield development projects, is part of Abu Dhabi’s major diversification plan to develop various sectors such as property, tourism, infrastructure and others. Abu Dhabi’s main existing port, Mina Zayed, is hemmed in by Abu Dhabi city, limiting its accessibility and the possibility for expansion.

The new Khalifa Port, located 4.6 km offshore, is built on an artificial island (Port Island) with a separate berth island (for Emirates Aluminum). These islands are connected to the mainland by causeways and bridges. Khalifa Port is scheduled to replace Mina Zayed by late 2012 and provides infrastructure for a wide range of industrial and commercial activities in Abu Dhabi. When completed, the first phase of Khalifa Port will handle 2 million TEUs, four times the capacity of Mina Zayed. In June 2007 the Khalifa Port Marine Consortium (KPMC) was formed with partners Boskalis Westminster Middle East Ltd., Archirodon Construction and Hyunday Engineering & Construction. In October 2007 KPMC was awarded a multi-faceted design, procurement and construction contract. The specified work included dredging of an access channel and port basin, land reclamation, rock protection works, breakwaters and quaywall construction, to be performed by the Consortium in which Boskalis had a 43% share. When the contract was awarded, most of the final Khalifa Port and Industrial Zone (KPIZ), Abu Dhabi design work for the port’s construction had yet to be done. The client – Abu Dhabi Ports Company (ADPC) – sought contractors with the skills and multidisciplinary services able to deliver design expertise as the operations progressed. Boskalis engineers from the inhouse company Hydronamic coordinated the design activities, not only in the dredging and reclamation works, but also in the rock protection works, breakwaters and construction of the quay walls, bridges and breakwaters.

Related projects

Selected filters
CIMG1866_header.jpg

Coastline fixation, Cotonou

The project was developed to arrest coastline erosion in the densely-populated centre of Cotonou caused by two phenomena: erosion and human interference along the West African coastline.

gavle_hamn_201319_DD_Bewerkt_header.jpg

Port extension, Port of Gävle

The Port of Gävle is located on the east coast of Sweden in the Gulf of Bothnia, facilitating Swedish imports and exports. The client wished to improve maritime safety and accessibility, and to increase the throughput of goods in this harbor.

20120229-DSC_3214_header.jpg

Port expansion, Onne

In May 2011 Boskalis was awarded the project for the expansion of the Federal Lighter Terminal and Federal Ocean Terminal of the Onne Port Complex by Prodeco International Limited. The project entails the reclamation of approximately 200 ha with suitable materials from nearby borrow areas.

Boskalis_Genova_VOLO_ph-merlo_110112-3725_header.jpg

Port upgrade, Genoa

The deepening and extension of the port of Genoa is needed to accommodate the larger container vessels and the ferries of MSC. The client is the Port Authority of Genoa. The project is being executed by Boskalis Italia S.r.l. in a joint venture with Tecnis S.p.A., an Italian company that is responsible for the construction work.

B_nieuw_header.jpg

Port and MOF, LNG plant Barrow Island, Gorgon

Design and construction of a new port and materials offloading facility in a class 'A' nature reserve. The project owner is developing LNG process facilities on Barrow Island off the north west coast of Western Australia approximately 140 km west of Dampier and 95 km north east of Onslow. Barrow Island is a Class A Nature Reserve and an internationally important conservation estate.

DSC_5770_header.jpg

Port development, Mombasa

The Port of Mombasa is currently the biggest port on the coast of East Africa north of Durban, and the only international port in Kenya. It is now in the throes of a huge expansion drive to both increase cargo handling capacity and accommodate Panamax and Post Panamax vessels. The port is a transit route for, mainly, Uganda, Rwanda, South Sudan and Northern Tanzania. The current container terminal has an installed capacity of 250,000 TEU but handled more than 770,000 TEU in 2011. The port will raise its profile as a regional hub by building a second container terminal with a capacity of 1.2 million TEU. The port authority decided to construct the container terminal in phases.