In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration Project (OCR) is a 70 million US$ construction and commissioning subcontract. The scope of work is the refurbishment and reinstatement of the North Water Station (NWS) and its hook up to the interconnecting piping at Olero Creek.

The scope involves fabrication, installation, transportation, testing, hook-up, commissioning and start-up. The Olero Creek facilities were vandalized during a period of civil unrest in 2003 and further detoriated the following years. The Olero Creek facilities are located in the Olero Creek Field in OML-49 lease and consist of:
  • The North Flow Station (NFS), including production separation and oil shipping; 
  • The North Water Station (NWS), including water treating and injection;
  • The North Compression Station (NCS), including gas compression and dehydration;
  • Quarters and Utilities Station (QUS), including accommodations, power generation and utilities.
The coordinates of the North Water Station (NWS) in the Olero Creek are:
  • Latitude: 05 degree 51 minutes 28.6811 seconds
  • Longitude: 05 degree 07 minutes 55.4051 seconds
These four gravity-based concrete barges are connected by Interconnecting Piping (ICP) along a bridge. The North Flow Station (NFS) together with a temporary production system called the Benin River Flow Station is transporting oil and water from Olero Creek to the CNL facilities at Escravos.
The Olero Creek facilities were vandalised during a period of civil unrest in 2003 and further deteriorated the years thereafter.  The subject contract covered the refurbishment of the North Flow Station (NFS) and the North Water Station (NWS).

NWDM General scope of work

The NWDM scope of work consisted of the refurbishment of existing equipment and installation of new equipment on the North Water Station (NWS) at the NWDM Merogun yard in Warri and the transportation, installation, hook-up, commissioning and start-up at the Olero Creek location on completion of the refurbishment works. The NWS is a concrete gravity based barge with dimension 51.92m x 24.44m x 4.27m. The barge arrived at the NWDM yard in December 2010.

Related projects

Selected filters
Fleet_OE_Moho.jpg

Transport and installation Moho Nord FPU

For the Total Moho Nord FPU project, Dockwise has transported the newbuild FPU Likouf from the HHI fabrication yard in Ulsan, South Korea to the offshore discharge location near Port-Gentil, Gabon. It was a world-record cargo load onboard a semi-submersible vessel to date. 

Thien_Ung_I.jpg

Installation topside
and living quarters,
Thien Ung BK-TNG

For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

1407-0505-30_header.jpg

Development gas export pipeline, Ichthys

The Ichthys development revolves around the construction of a new 42-inch deep sea natural gas pipeline from the Ichthys field in the Browse Basin 880 kilometers to Darwin onshore. The pipeline will run through the Darwin harbor, requiring dredging services in the near shore area, rock installation and the construction of a landfall. Owner INPEX Operations Australia Pty Ltd is developing LNG process facilities on Blaydin Point near Darwin, Northern Territory of Australia.

140718_-_48.jpg

Wintershall RAVN and A6-A

Wintershall Noordzee B.V. installed a new remote platform RAVN as a crude production tie-back to A6-A. RAVN is a remote and unmanned crude well unit. Utilising a dry-tree design, all control, power and metered injection for the well will be via the 18.2-km control umbilical between the new satellite platform RAVN in the Danish sector and the operational platform A6-A in the German sector.

AT2C5860_header.jpg

Dry transport,
FPSO Armada Intrepid

The Armada Intrepid, which is owned by the Malaysian company Bumi Armada, is an FPSO (Floating Production, Storage and Offloading) vessel which needed to be dry transported from Rotterdam (Netherlands) to Batam (Indonesia) on the Dockwise Vanguard. The FPSO is 245 m long and weighs 60,000 metric tons. The DWV (275 x 70 m) has a deadweight of 117,000 metric tons.

ZP_-_pic4_header.jpg

Mooring replacement phase 2, Zafiro Producer

Mobil Equatorial Guinea Incorporated, an affiliate of ExxonMobil, entered into a contract with Boskalis for the Zafiro Producer Mooring Replacement Project Phase 2. The Zafiro Producer is installed in 180 m (590 ft)water depth approximately 74 km (40 nauticalmiles) west of Malabo, Equatorial Guinea.