Refurbishment water station, Olero Creek

In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration Project (OCR) is a 70 million US$ construction and commissioning subcontract. The scope of work is the refurbishment and reinstatement of the North Water Station (NWS) and its hook up to the interconnecting piping at Olero Creek.

The scope involves fabrication, installation, transportation, testing, hook-up, commissioning and start-up. The Olero Creek facilities were vandalized during a period of civil unrest in 2003 and further detoriated the following years. The Olero Creek facilities are located in the Olero Creek Field in OML-49 lease and consist of:
  • The North Flow Station (NFS), including production separation and oil shipping; 
  • The North Water Station (NWS), including water treating and injection;
  • The North Compression Station (NCS), including gas compression and dehydration;
  • Quarters and Utilities Station (QUS), including accommodations, power generation and utilities.
The coordinates of the North Water Station (NWS) in the Olero Creek are:
  • Latitude: 05 degree 51 minutes 28.6811 seconds
  • Longitude: 05 degree 07 minutes 55.4051 seconds
These four gravity-based concrete barges are connected by Interconnecting Piping (ICP) along a bridge. The North Flow Station (NFS) together with a temporary production system called the Benin River Flow Station is transporting oil and water from Olero Creek to the CNL facilities at Escravos.
The Olero Creek facilities were vandalised during a period of civil unrest in 2003 and further deteriorated the years thereafter.  The subject contract covered the refurbishment of the North Flow Station (NFS) and the North Water Station (NWS).

NWDM General scope of work

The NWDM scope of work consisted of the refurbishment of existing equipment and installation of new equipment on the North Water Station (NWS) at the NWDM Merogun yard in Warri and the transportation, installation, hook-up, commissioning and start-up at the Olero Creek location on completion of the refurbishment works. The NWS is a concrete gravity based barge with dimension 51.92m x 24.44m x 4.27m. The barge arrived at the NWDM yard in December 2010.

Related projects

Selected filters
TSHD_Barent_Zanen_backfilling_at_Denia_header.jpg

Landfall construction
Balearic submarine pipeline

As part of its network expansion program, Enagas undertook the installation of a submarine pipeline providing natural gas from the Spanish mainland to the Balearic Islands of Ibiza and Mallorca, integrating them into the Spanish gas system. This 20" nominal diameter pipeline was constructed in two distinct sections, one of 123 km between the mainland and Ibiza and another of 146 km between Ibiza and Mallorca.

Baydaratskaya_Bay.jpg

Installation gas pipeline, Baydaratskaya Bay

The Baydaratskaya Bay Project is located in the Kara Sea in the North of Russia. The Kara Sea is bordered on its western side by Novaya Zemlya and on the east by the North Siberian Coast. Baydaratskaya Bay is located in the south of the Kara Sea between the Ural Coast and the Yamal Peninsula. Yamalgasinvest (Gazprom) is planning the construction of four pipelines and two cable crossings at Baydaratskaya Bay for the exploitation of the Bovanenkova and Harasawejskoje gas field on the Yamal Peninsula.

DPFV_Seahorse_moors_for_loading_header.jpg

Free span rectification gas pipeline, East Java

The existing live 28" East Java Gas Pipeline runs offshore from the Kangean Block, close to Pagerungan Besar Island, Kangean Islands, Indonesia, through the Madura Strait and onshore via Porong to Surabaya, Indonesia’s second largest city.

Installation_of_cofferdam_to_enable_trench_excavation_through_surf_zone_header.jpg

Crude oil unloading facilities, Sri Racha

Thai Oil Public Company Limited is the largest petroleum oil refiner and supplier in Thailand. To enable Very Large Crude Carriers (VLCC) up to 320,000 DWT or a freight capacity of up to two million barrels to berth at Thai Oil's refinery in Sri Racha, Chonburi Province, a second Single Buoy Mooring (SBM) facility was installed approximately 14 km offshore, in water depths of around 30 m. From this buoy, a 52' diameter concrete coated steel pipeline had to be installed to the landfall location near the Thai Oil refinery.

HL_Stralsund_header.jpg

Bridge construction, Stralsund

SMIT’s 1,200 tonnes sheerlegs Taklift 7 completed a major German bridge building programme during 2006. The sheerlegs had spent several months at the new Stralsund Bridge, on the German Baltic coast. This suspension bridge links the mainland with the island of Rügen.

Rion_Antirion_header.jpg

Heavy lift operations, Rion Antirion bridge

The Rion Antirion bridge, a 2.3 km long cable stayed bridge, consisting of 4 pylons from which the bridge deck is suspended. SMIT was involved in two phases of the project. During the construction of the pylons, SMIT carried out the management for the tow-out and positioning. For the installation of the steel components SMIT carried out the heavy lift operations.