For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

Boskalis successfully executed the lifting of the 4,200 mt Thien Ung topside followed by a 850 mt living quarters. The topside and living quarters were installed on a (preinstalled) jacket in the Nam Con Son Basin, at a water depth of 120 meters. The topside lift, which is the heaviest offshore lift by a sheerleg was successfully completed on 21 September 2016 and the living quarters on 24 September 2016. The project was performed by the Asian Hercules III which is a 5,000 mt sheerleg operated by Asian Lift, a joint venture company between Boskalis and Keppel.

Scope

  • Installation engineering, comprising of lifting analysis, rigging design, mooring analysis
  • Preparation and mobilization of Asian Hercules III
  • Anchor pattern set-up and interface with transport barges
  • Lift and install of 4,200 mt topside and 850 mt living quarters
  • Demobilization of Asian Hercules III and reinstatement


Project challenges

It is the first offshore project for Asian Hercules III. The project was also executed in an extremely fast track manner to avoid the offshore installation period slipping into the monsoon months.


NINA

The project was executed without incident. The NINA initiative was not only inculcated within the Boskalis PMT and Asian Lift but also with WL Management and Vietsovpetro.


Conclusion

The success of the project was due to the strong cooperation between all parties. In spite of the short preparation and execution time, a strong focus on engineering, safety and sound operational excellence ensured the timely completion of this project.

Related projects

Selected filters
Taklift_4.jpg

Jotun A

The Jotun A FPSO, a 92,000 DWT FPSO capable of producing 70,000 bpd, began producing in 1999 on the Jotun field (Norway). As part of Vår Energi’s investment in increased oil recovery from the Balder field in the North Sea an upgrade of the Jotun FPSO is required. The Balder Future project will extend the life of the field (PL 001) by 2045, giving Norway’s oldest license a lifetime of 80 years.

Bokalift_1.jpg

L10 -C -D & -G Decommissioning

Neptune Energy Netherlands B.V. (Neptune) has awarded Boskalis the contract for the removal, transport and load-in of three platforms. These platforms are located in the Dutch North Sea, approximately 90 km west of Terschelling.

Large-190412_-_38.jpg

Borssele ALPHA/BETA

Royal Boskalis Westminster is a leading global marine contractor and services provider. With safety as our core value, we offer a wide variety of specialist activities to the oil & gas and renewa-bles sectors. These activities include marine instal-lation and decommissioning, seabed intervention, marine transport and services, subsea services and marine survey. In addition, Boskalis is a global dredging contractor, provides towage and terminal services across the globe and delivers marine salvage solutions. By understanding what drives our clients we are able to provide the solutions that enable them to meet their specific business goals. For this reason we are constantly looking for new ways to broaden and optimize our offering and are committed to expanding our proposition, supported by our financial strength. With our committed professionals in engineering, project management and operations, 800 special-ized vessels and an unprecedented breadth of activities in 90 countries across six continents we help our clients in the offshore industry push boundaries and create new horizons.

E_-_Tower_Crane_Installation.JPG

1915 Çanakkale Bridge

The 1915 Çanakkale Bridge, also known as the Çanakkale Strait Bridge, is a proposed suspension bridge being constructed in the Çanakkale area in Turkey. Situated just south of the towns of Lapseki in Asia and Sütlüce Village in Europe. The bridge will span the Dardanelles strait, about 10 km south of the Sea of Marmara.

Aberdeen bay offshore windfarm project

Boskalis was responsible for the eleven suction bucket jacket foundations, scour protection, 66 kV inter array and export cables and the installation of the wind turbine generators.

NASR.jpg

NASR full field development

Boskalis was subcontracted to install 2 topsides and 3 jackets in the NASR and Umm Shait oil fields: The Accommodation Platform/AP Jacket, the Separation Platform/SP Jacket and the Gas Treatment Platform/GTP Jacket are installed in the NASR Field. The installed net weights of the jackets ranged from 2,270 to 3,070 metric tons.