Installation topside
and living quarters,
Thien Ung BK-TNG

For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

Boskalis successfully executed the lifting of the 4,200 mt Thien Ung topside followed by a 850 mt living quarters. The topside and living quarters were installed on a (preinstalled) jacket in the Nam Con Son Basin, at a water depth of 120 meters. The topside lift, which is the heaviest offshore lift by a sheerleg was successfully completed on 21 September 2016 and the living quarters on 24 September 2016. The project was performed by the Asian Hercules III which is a 5,000 mt sheerleg operated by Asian Lift, a joint venture company between Boskalis and Keppel.

Scope

  • Installation engineering, comprising of lifting analysis, rigging design, mooring analysis
  • Preparation and mobilization of Asian Hercules III
  • Anchor pattern set-up and interface with transport barges
  • Lift and install of 4,200 mt topside and 850 mt living quarters
  • Demobilization of Asian Hercules III and reinstatement


Project challenges

It is the first offshore project for Asian Hercules III. The project was also executed in an extremely fast track manner to avoid the offshore installation period slipping into the monsoon months.


NINA

The project was executed without incident. The NINA initiative was not only inculcated within the Boskalis PMT and Asian Lift but also with WL Management and Vietsovpetro.


Conclusion

The success of the project was due to the strong cooperation between all parties. In spite of the short preparation and execution time, a strong focus on engineering, safety and sound operational excellence ensured the timely completion of this project.

Related projects

Selected filters
Fleet_OE_Moho.jpg

Transport and installation Moho Nord FPU

For the Total Moho Nord FPU project, Dockwise has transported the newbuild FPU Likouf from the HHI fabrication yard in Ulsan, South Korea to the offshore discharge location near Port-Gentil, Gabon. It was a world-record cargo load onboard a semi-submersible vessel to date. 

Thien_Ung_I.jpg

Installation topside
and living quarters,
Thien Ung BK-TNG

For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

1407-0505-30_header.jpg

Development gas export pipeline, Ichthys

The Ichthys development revolves around the construction of a new 42-inch deep sea natural gas pipeline from the Ichthys field in the Browse Basin 880 kilometers to Darwin onshore. The pipeline will run through the Darwin harbor, requiring dredging services in the near shore area, rock installation and the construction of a landfall. Owner INPEX Operations Australia Pty Ltd is developing LNG process facilities on Blaydin Point near Darwin, Northern Territory of Australia.

140718_-_48.jpg

Wintershall RAVN and A6-A

Wintershall Noordzee B.V. installed a new remote platform RAVN as a crude production tie-back to A6-A. RAVN is a remote and unmanned crude well unit. Utilising a dry-tree design, all control, power and metered injection for the well will be via the 18.2-km control umbilical between the new satellite platform RAVN in the Danish sector and the operational platform A6-A in the German sector.

AT2C5860_header.jpg

Dry transport,
FPSO Armada Intrepid

The Armada Intrepid, which is owned by the Malaysian company Bumi Armada, is an FPSO (Floating Production, Storage and Offloading) vessel which needed to be dry transported from Rotterdam (Netherlands) to Batam (Indonesia) on the Dockwise Vanguard. The FPSO is 245 m long and weighs 60,000 metric tons. The DWV (275 x 70 m) has a deadweight of 117,000 metric tons.

ZP_-_pic4_header.jpg

Mooring replacement phase 2, Zafiro Producer

Mobil Equatorial Guinea Incorporated, an affiliate of ExxonMobil, entered into a contract with Boskalis for the Zafiro Producer Mooring Replacement Project Phase 2. The Zafiro Producer is installed in 180 m (590 ft)water depth approximately 74 km (40 nauticalmiles) west of Malabo, Equatorial Guinea.