The shoreline of Panama has increasingly become densely populated and, as the economy has boomed over the past 10 years, there is strong demand for high-end products. The real-estate market has taken a revolutionary step with the completion of the the first artificial real-estate island in the Americas.

The Santa Maria island is named after one of the vessels used by Christopher Colombus on his first transatlantic voyage in 1492. The island is connected to the shore by a bridge. The project was initiated by the Ocean Reef Island Inc., and Boskalis Panama S.A. was awarded the Design and Construct contract at the end of a tender procedure. The decisive factors included not only the price but also, and more importantly, the reliability of the contractor in terms of quality, the involvement of local management, the proposed construction method, equipment resources, and in-house engineering capability and capacity. After completing two pre-contracts (the construction of a promotional island and the partial removal of soft sediments), the main contract was finally signed on 7 January 2011.

The construction of the island

The first step in the project was the dredging and disposal of the soft sediments overlaying the weathered rock layer with the clamshell Alex and TSHD Flevo. Work then started on the construction of the rock dike. The rock was produced by the Client in the area of Vacamonte and then taken by truck to the Boskalis loading facility alongside the port of Vacamonte. Prior to the start of the contract the Client and Boskalis undertook a detailed soil investigation in the (rock)quarry area in order to establish the presence of the various required gradings. Also during the quarry activities Boskalis supported the Client in order to achieve an optimal quarry performance. The loading facility is in a location that is not sheltered against the long pacific swells. Adopting a flexible loading structure reduced downtime and Boskalis was able to match rock production output without difficulty. A total of five different types of rock grading were used to work as cost-effectively as possible while maintaining the stability of the island given the long and strong swells. The inside of the rock dike was covered with a geotextile to prevent the loss of sand through the dike back into the ocean. By April 2012, the island was ready for filling with sand.

Related projects

Selected filters
DSC04359_header.jpg

Port access channel dredging, Walvis Bay

The port of Walvis Bay is a naturally sheltered deepwater harbor on the west coast of Africa. The port is part of a transit route linking Southern Africa, Europe and the Americas and it is Namibia’s largest commercial port, handling around 5 million tons of cargo each year. The container terminal can accommodate a throughput of about 250,000 containers per year.

IMG_8772_header.jpg

Coastal protection, St. Petersburg

St. Petersburg is a UNESCO World Heritage City, but its location along the River Neva means that it has been threatened by over 300 floods since its founding by Peter the Great in 1703. The completion of the new 25 km long storm-surge barrier across the Gulf of Finland ensures that the city will no longer be vulnerable to high tides and devastating floods. As a result of the new Flood Protection Barrier, however, the old winding access channel had to be replaced with a new, straighter, more easily navigable channel.

Delflandse_coast___3__header.jpg

Coastal protection, Delfland coast

In August 2008 Van Oord and Royal Boskalis Westminster N.V. have been awarded a contract by the Dutch Directorate General for Public Works and Water Management to reinforce a weak link in the Delflandse coast . The contract is worth EUR 120 million of which Van Oord and Boskalis have an equal share.

IMG_1888_header.jpg

Cleanup, Zellingwijk area

The Zellingwijk quarter of the village of Gouderak was built in the middle of the last century. In the early 1980s it became clear that the soil underneath this residential area was heavily contaminated as a result of the dumping of waste - mainly mineral oils and pesticides. The homes built on the site were subsequently demolished in the mid-1980s. Pending definitive remediation work, a layer of concrete / asphalt was applied to seal the site.

DSCF0279_header.jpg

Overview activities, Bahrain

The Kingdom of Bahrain is an island located in the Gulf, east of Saudi Arabia and north of Qatar and connected with its neighbour Saudi Arabia since the year 1980 with a 25 km long causeway. The archipelago consists of some 30 islands with a total of 160 km of shoreline and has a population of 800,000. Whereas the surface of Bahrain in the year 1960 was around 650 km2, the last decennia have seen a steady increase in the surface till a respectable figure of 740 km2 in 2007. This increase has been achieved by a various number of small and mayor reclamation projects.

37ac96e429c252fd55f1136ce6374c9e_image_header.jpg

Early works for LNG plant, Brass Island

The Brass LNG Project’s objective is to construct a LNG Complex on Brass Island, Bayelsa State, Nigeria, and in so doing, develop Nigeria’s abundant gas resources, reduce the adverse effect of gas flaring on the environment, and provide social-economic benefits to the local and wider Nigerian communities. The LNG complex will be designed to produce approximately 10 million tons per annum (MTPA) of LNG, as well as LPG and Residual NGL products.