Mooring replacement phase 2, Zafiro Producer

Mobil Equatorial Guinea Incorporated, an affiliate of ExxonMobil, entered into a contract with Boskalis for the Zafiro Producer Mooring Replacement Project Phase 2. The Zafiro Producer is installed in 180 m (590 ft)water depth approximately 74 km (40 nauticalmiles) west of Malabo, Equatorial Guinea.

The Zafiro oil field is located in the 500,000-acre Block B, 68 km (42 miles) WNW of Bioko island, Equatorial Guinea, adjacent to the international border with Nigeria. Water depths range from less than 300 ft to greater than 5,000 ft. The Zafiro-1 discovery well was drilled in February 1995, testing at 10,400 barrels per day (b/d). Three subsequent wells showed the reservoir to be relatively shallow (around 5,000 ft), and low pressure, with a bottom-hole shut-in pressure of 2,800 psig. The Zafiro Producer is a converted 268,191 dwt VLCC (very large crude carrier). The tanker was built in 1973, with an overall length of 331.5 m, a breadth of 56 m and a depth of 26.4 m. It has a draught of 20.5 m fully loaded, or 8.3 m ballasted. Early reservoir evaluation indicated that a 40,000 b/d rate could be expected from the planned eight wells, requiring the installation of an 80,000 b/d process plant, a 40 MMSCFD gas flare capacity and storage for 1.7 MMBBL of oil.The FPSO was installed in 1996 and later the storage capacity was taken over by the Serpentina changing the Zafiro Producer into a FPU (Floating Production Unit).

Mooring replacement

This 2015 campaign concluded a partial mooring replacement for ML 1, 2, 4, 8, 9, 10, 11 and 12 as well as a complete mooring replacement for ML 3. The project scope of the Phase 2 mooring replacement consisted of the following:

  • Installation of two new anchors utilizing a reaction anchor for tensioning;
  • Inspection of specified mooring components;
  • Change out of most, if not all, components for a full replacement of two of the mooring lines;
  • Change out of specified components for a partial replacement of seven of the mooring lines;
  • Removal of samples for forensic analysis.

Related projects

Selected filters
TR_Giant_4_header.jpg

Offshore wind farm, Sprogø

On behalf of marine contractor Aarsleff, SMIT was involved in the construction of the new Sprogø Offshore Windfarm, west of Copenhagen.

TSHD_Barent_Zanen_backfilling_at_Denia_header.jpg

Landfall construction
Balearic submarine pipeline

As part of its network expansion program, Enagas undertook the installation of a submarine pipeline providing natural gas from the Spanish mainland to the Balearic Islands of Ibiza and Mallorca, integrating them into the Spanish gas system. This 20" nominal diameter pipeline was constructed in two distinct sections, one of 123 km between the mainland and Ibiza and another of 146 km between Ibiza and Mallorca.

Baydaratskaya_Bay.jpg

Installation gas pipeline, Baydaratskaya Bay

The Baydaratskaya Bay Project is located in the Kara Sea in the North of Russia. The Kara Sea is bordered on its western side by Novaya Zemlya and on the east by the North Siberian Coast. Baydaratskaya Bay is located in the south of the Kara Sea between the Ural Coast and the Yamal Peninsula. Yamalgasinvest (Gazprom) is planning the construction of four pipelines and two cable crossings at Baydaratskaya Bay for the exploitation of the Bovanenkova and Harasawejskoje gas field on the Yamal Peninsula.

DPFV_Seahorse_moors_for_loading_header.jpg

Free span rectification gas pipeline, East Java

The existing live 28" East Java Gas Pipeline runs offshore from the Kangean Block, close to Pagerungan Besar Island, Kangean Islands, Indonesia, through the Madura Strait and onshore via Porong to Surabaya, Indonesia’s second largest city.

DSC01999_header.jpg

Development LNG field, Snøhvit

The Snøhvit development comprises three fields – Snøhvit, Albatross and Askeladd. These are located in the Barents Sea, about 140 kilometers north-west of Hammerfest in northern Norway. All primarily contain natural gas with small quantities of condensate. Snøhvit is the first major development on the Norwegian continental shelf without surface installations.

Installation_of_cofferdam_to_enable_trench_excavation_through_surf_zone_header.jpg

Crude oil unloading facilities, Sri Racha

Thai Oil Public Company Limited is the largest petroleum oil refiner and supplier in Thailand. To enable Very Large Crude Carriers (VLCC) up to 320,000 DWT or a freight capacity of up to two million barrels to berth at Thai Oil's refinery in Sri Racha, Chonburi Province, a second Single Buoy Mooring (SBM) facility was installed approximately 14 km offshore, in water depths of around 30 m. From this buoy, a 52' diameter concrete coated steel pipeline had to be installed to the landfall location near the Thai Oil refinery.