NORDSTREAM II

Allseas Engineering had been awarded with the contract to support partly with construction of the offshore natural gas transmission system comprising two 48” diameter pipelines from Russia to the Baltic through Germany (NPSP2). The installation of the NSP2 pipeline has been performed by Charterers pipelay vessels: Solitaire, Pioneering Spirit and Audacia.

Boskalis was awarded by Allseas Engineeirng to perform anchor handling assistance and survey and ROV support during the pipelay work conducted by the PLV Audacia. The southern section of the two pipelines was installed by PLV Audacia without utilizing her DP system. This was a requirement from Charterers client and the vessel had therefore been fitted with 10 mooring spread to maintain position during the pipelay operation. The work was performed in German waters from Global KP point 1197 to 1159 – Country KP 17 – 55 in a water depth ranging from 17 to 25 m. This required anchor handlers above 150 Tonnes Bollard Pull which were capable of handling9 x 18mT Stevshark Rex anchors2 x 16mT Stevshark anchorsFurthermore Boskalis provided in-house survey and ROV equipment in order toPerform TDM (Touchdown monitoring) using a pole mounted MBES (multibeam echosounder)Perform TDM with the ROVCheck and confirm anchor catenaries using either MBES or ROV when requested by PLV Audacia. For this scope the 205TBP AHTS Union Manta was outfitted with survey and ROV equipment. Also dedicated shore support in Mukran was provided to ensure an efficient operation. With all Boskalis’ projects safety is an essential part. The project was executed with a good safety performance of the marine crew and project management. The marine spread was manned to perform 24/7 anchor handling and survey duties. Also dedicated shore support in Mukran was provided to ensure a efficient operation. The marine spread exceeded CLIENT’s expectations while maintaining the highest safety and sustainability standards, Boskalis through combining various inhouse disciplines and due to its diverse and large fleet size was able to provide an all round solution as requested by our client.

Related projects

Selected filters
DJI_0005__4_.JPG

Construction of greenfield port and breakwater for Dangote quays Lekki

The Dangote Group, owned by Aliko Dangote, is building Africa’s largest oil refinery and fertilizer plant in Lekki, 60 kilometers east of Lagos, Nigeria. To facilitate the import of out-of-gauge components and other materials required for construction activities, a port was constructed

P67.jpg

P67 FPSO Transportation

On behalf of Company Petrobras and Client COOEC, Boskalis executed the dry transportation of the P-67 FPSO in 2018 from the COOEC Qingdao yard in China to Rio de Janeiro in Brazil. The P-67 FPSO will produce 150,000 bpd and compress six million cubic meters of natural gas daily in the Lula North section of the Lula-Cernambi field in the Santos basin.

Harderwijk_Lorentzhaven__7__header.jpg

Redevelopment Waterfront, Harderwijk

Boskalis Nederland is involved in one of the largest redevelopment projects in the Netherlands. The Harderwijk Waterfront project involves the complete transformation of the lakeside area of this IJsselmeer town. The project covers a strip approximately six kilometers long, combining homes, work and recreation in a natural way. The Harderwijk Waterfront will generate a quality boost in many areas: quality of life, employment, traffic, tourism and the environment.

Pluit_City_Island-bird_eye_view.jpg

Artificial island
off the coast of
Jakarta, Indonesia

Boskalis has been awarded a contract by PT Muara Wisesa Samudra to design and construct an artificial island measuring 160 hectares off the coast of Jakarta, Indonesia. The work is part of the dredging and land development works for the new Pluit City. It will be executed in a joint venture with Van Oord.

Medium-Foto_1_-_artist_impression_nw_situatie_A1_afslag_met_spoorbrug__1_.jpg

Road enlargement motorway A1-A6, Diemen-Almere

The A1/A6 project is one of the five sub-projects for Rijkswaterstaat that are included in the upgrading of the road network linking Schiphol Airport, Amsterdam, and Almere (SAA). The total length of the SAA link is 40 kilometers. Boskalis, together with partners, is responsible for the section from the Diemen intersection to Almere, a distance of approximately 23 kilometers.

29-8-11_006_header.jpg

Port maintenance,
Açu Port

Açu Port in São João da Barra, Rio de Janeiro (Brazil) is one of the largest port-industry complex in Latin America. The port consists of two terminals: T1, an offshore terminal for handling iron ore and oil, and T2, an onshore terminal built around the inner navigation channel which accommodates offshore supply companies and will handle bauxite, general cargo and vehicles.