NORDSTREAM II

Allseas Engineering had been awarded with the contract to support partly with construction of the offshore natural gas transmission system comprising two 48” diameter pipelines from Russia to the Baltic through Germany (NPSP2). The installation of the NSP2 pipeline has been performed by Charterers pipelay vessels: Solitaire, Pioneering Spirit and Audacia.

Boskalis was awarded by Allseas Engineeirng to perform anchor handling assistance and survey and ROV support during the pipelay work conducted by the PLV Audacia. The southern section of the two pipelines was installed by PLV Audacia without utilizing her DP system. This was a requirement from Charterers client and the vessel had therefore been fitted with 10 mooring spread to maintain position during the pipelay operation. The work was performed in German waters from Global KP point 1197 to 1159 – Country KP 17 – 55 in a water depth ranging from 17 to 25 m. This required anchor handlers above 150 Tonnes Bollard Pull which were capable of handling9 x 18mT Stevshark Rex anchors2 x 16mT Stevshark anchorsFurthermore Boskalis provided in-house survey and ROV equipment in order toPerform TDM (Touchdown monitoring) using a pole mounted MBES (multibeam echosounder)Perform TDM with the ROVCheck and confirm anchor catenaries using either MBES or ROV when requested by PLV Audacia. For this scope the 205TBP AHTS Union Manta was outfitted with survey and ROV equipment. Also dedicated shore support in Mukran was provided to ensure an efficient operation. With all Boskalis’ projects safety is an essential part. The project was executed with a good safety performance of the marine crew and project management. The marine spread was manned to perform 24/7 anchor handling and survey duties. Also dedicated shore support in Mukran was provided to ensure a efficient operation. The marine spread exceeded CLIENT’s expectations while maintaining the highest safety and sustainability standards, Boskalis through combining various inhouse disciplines and due to its diverse and large fleet size was able to provide an all round solution as requested by our client.

Related projects

Selected filters

Shell Malikai

Malikai is a deepwater oil discovery in offshore Sabah, Malaysia where Sabah Shell Petroleum Company is the designated Operator. A floating Dry Tree Unit (DTU) will be installed over Malikai field utilizing a Tension Leg Platform (TLP) design that suits the Malikai environment.

FF66817_header.jpg

Coastal development, Hondsbossche and
Pettemer Sea Defense

A joint venture of Boskalis Nederland and Van Oord has been commissioned by the Hollands Noorderkwartier water control board to reinforce the Hondsbossche and Pettemer Sea Defense between the villages of Petten and Camperduin on the coast of the Dutch province of Noord-Holland.

Cornelis_Zanen.jpg

Maintenance dredging, Yangon River

Located close to the city centre on the Yangon River, Yangon Port has been the main port to Myanmar since colonial times. Currently, the port has capacity for vessels of up to 15,000 –20,000 DWT and works are scheduled to increase the port’s capacity for vessels up to 35,000 DWT.

Gabon_Libreville1920.jpg

Port development,
Libreville - Gabon

A new area was constructed in the Port of Libreville for a mineral terminal, dry dock, fishing port, processing facilities and other port activities, such as aggregate processing. This new port development was required to improve and strengthen the logistic capacity for the inland mining industry, to reduce export costs, and thus to increase the competitiveness of mineral exports from Gabon.

Butendiek OWF

Boskalis was contracted by OWP Butendiek GmbH & Co. KG to supply, install and protect (by post-lay burial) the high-voltage inter-array cable at the offshore wind farm of Butendiek. This German wind farm is situated in the German Bight (Nordsea), approx. 35 km west of the island of Sylt. The 33 km2 wind farm consists of 80 wind turbines with a capacity of 3.6 MW each and a total capacity of 288 MW. The inauguration of the wind farm took place on September 8, 2015. It provides renew-able energy to approx. 370,000 households.

IMG_3549_header.jpg

Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.