Port expansion LNG terminal, Cuyutlán

The Mexican Ministry of Communications and Transport awarded Royal Boskalis Westminster N.V. two contracts for dredging an access channel and turning basin at the Cuyutlán liquefied natural gas import terminal on the west coast of Mexico.

Scope of work

This first phase of the project required the construction of an access channel and the deepening of a lagoon to create part of a turning basin. Due to two existing bridges it was required that the dredging equipment was mobilized to Cuyutlan on top of pontoons so it could be offloaded onto the shore and  transported over land for several hundreds of meters and launched into the lagoon before the dredging operations could commence. This port expansion project was driven by a need to cater to larger vessels and future trade volumes. This Liquefied Natural Gas (LNG) project emphasizes the need for infrastructure to accommodate strong demand for energy resources. The second and final phase of the dredging work required further dredging in the lagoon and at the outer part of the access channel. The work includes the deepening of the basin, the construction of an access channel and the creation of a turning basin. Boskalis has a strong home market position in Mexico and the majority of the Boskalis work was executed by our own local employees.

Design and execution

During the execution of the project the scope of the work shifted continuously. As a consequence access to the site was held up by delays in the work of other parties. The client extended the contract duration and it was therefore still possible to deliver the project on time. Most of the engineering was done by third parties, with Hydronamic (the Boskalis engineering consultancy) playing a supporting role. The most significant changes in the scope of work, such as the clearance of old breakwaters of  175,000 m3, were solved by Hydronamic.

Related projects

Selected filters
hires-6917.jpg

Construction motorway, A4 Delft-Schiedam

Boskalis Nederland was involved in the construction of the A4 motorway from Delft to Schiedam. The client is Rijkswaterstaat. After 40 years, the construction of this final section will bring to an end the public debate about whether this new road was needed.

Boskalis_Suezkanaal_cutter_suction_dredgers_4153_header.jpg

Channel expansion, Suez

The Suez Canal is one of the world’s main shipping links and thus of major importance to world trade. The canal extends from Suez on the Red Sea to Port Said on the Mediterranean. Egypt’s Suez Canal Authority awarded the contract to double the canal’s capacity to a consortium, which was aptly named the Challenge Consortium by the Chairman of the Suez Canal Authority, Admiral Mohab Mamish.

DSC_0008_header.jpg

Onshore co-mining project, Lelydorp

Suralco L.L.C., an indirect joint subsidiary of Alcoa Inc. and Alumina Ltd., has awarded Boskalis a contract for the mining of bauxite in Lelydorp, Suriname. Boskalis is responsible for the entire mining process, from engineering and overburden removal to bauxite mining and ore delivery.

Picture_6_header.jpg

Port development, Cherbourg

To accommodate an assembly plant for wind turbines, a 220 m quay wall had to be added to the existing quay and two hectares of land behind the new quay had to be reclaimed.

P1030713_header.jpg

Dredging and reclamation, Songdo International City

Boskalis has been awarded a contract by Daewoo E&C for the dredging and reclamation of new land for Songdo International City on the waterfront of Incheon, South Korea. The total value of the contract amounts to approximately EUR 80 million.

CIMG1866_header.jpg

Coastline fixation, Cotonou

The project was developed to arrest coastline erosion in the densely-populated centre of Cotonou caused by two phenomena: erosion and human interference along the West African coastline.