Port expansion LNG terminal, Cuyutlán

The Mexican Ministry of Communications and Transport awarded Royal Boskalis Westminster N.V. two contracts for dredging an access channel and turning basin at the Cuyutlán liquefied natural gas import terminal on the west coast of Mexico.

Scope of work

This first phase of the project required the construction of an access channel and the deepening of a lagoon to create part of a turning basin. Due to two existing bridges it was required that the dredging equipment was mobilized to Cuyutlan on top of pontoons so it could be offloaded onto the shore and  transported over land for several hundreds of meters and launched into the lagoon before the dredging operations could commence. This port expansion project was driven by a need to cater to larger vessels and future trade volumes. This Liquefied Natural Gas (LNG) project emphasizes the need for infrastructure to accommodate strong demand for energy resources. The second and final phase of the dredging work required further dredging in the lagoon and at the outer part of the access channel. The work includes the deepening of the basin, the construction of an access channel and the creation of a turning basin. Boskalis has a strong home market position in Mexico and the majority of the Boskalis work was executed by our own local employees.

Design and execution

During the execution of the project the scope of the work shifted continuously. As a consequence access to the site was held up by delays in the work of other parties. The client extended the contract duration and it was therefore still possible to deliver the project on time. Most of the engineering was done by third parties, with Hydronamic (the Boskalis engineering consultancy) playing a supporting role. The most significant changes in the scope of work, such as the clearance of old breakwaters of  175,000 m3, were solved by Hydronamic.

Related projects

Selected filters
CIMG1866_header.jpg

Coastline fixation, Cotonou

The project was developed to arrest coastline erosion in the densely-populated centre of Cotonou caused by two phenomena: erosion and human interference along the West African coastline.

gavle_hamn_201319_DD_Bewerkt_header.jpg

Port extension, Port of Gävle

The Port of Gävle is located on the east coast of Sweden in the Gulf of Bothnia, facilitating Swedish imports and exports. The client wished to improve maritime safety and accessibility, and to increase the throughput of goods in this harbor.

20120229-DSC_3214_header.jpg

Port expansion, Onne

In May 2011 Boskalis was awarded the project for the expansion of the Federal Lighter Terminal and Federal Ocean Terminal of the Onne Port Complex by Prodeco International Limited. The project entails the reclamation of approximately 200 ha with suitable materials from nearby borrow areas.

Boskalis_Genova_VOLO_ph-merlo_110112-3725_header.jpg

Port upgrade, Genoa

The deepening and extension of the port of Genoa is needed to accommodate the larger container vessels and the ferries of MSC. The client is the Port Authority of Genoa. The project is being executed by Boskalis Italia S.r.l. in a joint venture with Tecnis S.p.A., an Italian company that is responsible for the construction work.

B_nieuw_header.jpg

Port and MOF, LNG plant Barrow Island, Gorgon

Design and construction of a new port and materials offloading facility in a class 'A' nature reserve. The project owner is developing LNG process facilities on Barrow Island off the north west coast of Western Australia approximately 140 km west of Dampier and 95 km north east of Onslow. Barrow Island is a Class A Nature Reserve and an internationally important conservation estate.

DSC_5770_header.jpg

Port development, Mombasa

The Port of Mombasa is currently the biggest port on the coast of East Africa north of Durban, and the only international port in Kenya. It is now in the throes of a huge expansion drive to both increase cargo handling capacity and accommodate Panamax and Post Panamax vessels. The port is a transit route for, mainly, Uganda, Rwanda, South Sudan and Northern Tanzania. The current container terminal has an installed capacity of 250,000 TEU but handled more than 770,000 TEU in 2011. The port will raise its profile as a regional hub by building a second container terminal with a capacity of 1.2 million TEU. The port authority decided to construct the container terminal in phases.