Port expansion LNG terminal, Cuyutlán

The Mexican Ministry of Communications and Transport awarded Royal Boskalis Westminster N.V. two contracts for dredging an access channel and turning basin at the Cuyutlán liquefied natural gas import terminal on the west coast of Mexico.

Scope of work

This first phase of the project required the construction of an access channel and the deepening of a lagoon to create part of a turning basin. Due to two existing bridges it was required that the dredging equipment was mobilized to Cuyutlan on top of pontoons so it could be offloaded onto the shore and  transported over land for several hundreds of meters and launched into the lagoon before the dredging operations could commence. This port expansion project was driven by a need to cater to larger vessels and future trade volumes. This Liquefied Natural Gas (LNG) project emphasizes the need for infrastructure to accommodate strong demand for energy resources. The second and final phase of the dredging work required further dredging in the lagoon and at the outer part of the access channel. The work includes the deepening of the basin, the construction of an access channel and the creation of a turning basin. Boskalis has a strong home market position in Mexico and the majority of the Boskalis work was executed by our own local employees.

Design and execution

During the execution of the project the scope of the work shifted continuously. As a consequence access to the site was held up by delays in the work of other parties. The client extended the contract duration and it was therefore still possible to deliver the project on time. Most of the engineering was done by third parties, with Hydronamic (the Boskalis engineering consultancy) playing a supporting role. The most significant changes in the scope of work, such as the clearance of old breakwaters of  175,000 m3, were solved by Hydronamic.

Related projects

Selected filters
8620740517_e75a0d7703_o_1__header.jpg

Reinforcing Dutch
coastline, Sandmotor

In December 2010 Royal Boskalis Westminster N.V. was awarded a contract by the Dutch Directorate General for Public Works and Water Management to reinforce part of the coastline in the province of Zuid-Holland by creating a ‘sand engine’. The total value of the contract is EUR 50 million for the Van Oord- Boskalis consortium, in which Boskalis has a 50% stake.

IMG_1101_header.jpg

Port expansion LNG terminal, Cuyutlán

The Mexican Ministry of Communications and Transport awarded Royal Boskalis Westminster N.V. two contracts for dredging an access channel and turning basin at the Cuyutlán liquefied natural gas import terminal on the west coast of Mexico.

Oranje___CDF_31Oct11__2__-_aangepast_header.jpg

Design and construction harbor channel, Sydney harbor

The 'Sydney Harbor Channel Dredging Project' in Nova Scotia, Canada, involved dredging and reclamation work as part of the construction of the new Sydney Port container terminal located on the northeast coast of Canada. Once operational, Sydney Port will be the most northerly deepwater container terminal on the North American east coast.

9CHP0243_header.jpg

Port construction,
Khalifa port

The Khalifa Port and Industrial Zone (KPIZ), one of the world’s largest greenfield development projects, is part of Abu Dhabi’s major diversification plan to develop various sectors such as property, tourism, infrastructure and others. Abu Dhabi’s main existing port, Mina Zayed, is hemmed in by Abu Dhabi city, limiting its accessibility and the possibility for expansion.

edax_aroima_copy_header.jpg

Maintenance dredging, Berbice River

One of Guyana’s major export products is bauxite, which originates from the Aroaima, Kwakwani and Ituni regions around the Demerara and Berbice rivers in north-eastern Guyana. Guyana annually exports approximately 2.2 million tons of bauxite from it’s mines along the Berbice River. Boskalis International has long been associated with the mining industry in Guyana. In 1990 a long-term overburden removal project for the Aroaima mine was begun in Guyana involving the dredging and disposal of a sand and clay layer of 30-45 meters thickness.

CHP10918_header.jpg

Port reconfiguration, Felixstowe

Capital dredging and filling works for new quay development (previously known as Landguard Redevelopment). Phase 1 of the reconfiguration programme consists of: 730 m new deep water quay and 200,000 m2 container handling area achieved by installing new quay in front of old Landguard port structures and redevelopment of the old Landguard terminal.