PUMA, the Project Organization for the Extension of the Maasvlakte, is a 50/50 joint venture between dredging and marine contractors Boskalis and Van Oord. The consortium has been contracted by the Rotterdam Port Authority to construct the first phase of the Maasvlakte 2 Project – the extension of the Port of Rotterdam – between 2008 and 2013. The new zone will encompass 2,000 hectares of new land, roughly the same size as the total surface area of Schiphol airport. Half of the area will become land for a future business park.

The first phase of Maasvlakte 2 comprises an industrial site area measuring 700 hectares. The port basins are dredged to –20 m NAP (Normal Amsterdam Water Level), so that even the largest (next generation) container vessels can dock. An important component of the project is the construction of the overall sea defenses. The outer contour bordering the sea is about 11 kilometers long, and includes a hard (rocks) and a soft (dunes) section. The 3.5 km hard section requires 20,000 concrete blocks, each weighing approximately 40,000 kg and 7 million tons of broken rock, of which 1.5 million tons is recycled from the existing sea defenses, from Maasvlakte 1, and 5.5 million tons is imported from quarries in North-West Europe (mainly from Norway). PUMA is also managing the construction of the quaywalls, railways and roads for the Maasvlakte 2 project. About 140,000 tons of asphalt, 110.000 tons of mixed aggregate and 112,000 m2 of sandcement stabilisation will be used for the construction of the roads.

'We are pleased and proud as a Dutch company to be involved in this major project in our own country. The Second Maasvlakte confirms the position of the Netherlands as a leading nation in maritime construction.' Peter Berdowski
Boskalis CEO

Conclusion

The construction of Maasvlakte 2 is one of the most high-profile projects in the history of hydraulic engineering. The complexity and the enormous dimensions of the project are unrivalled. The project is carried out according to the highest quality and safety standards, resulting in the lowest Lost Time Injury Frequency (LTIF) figures ever achieved in The Netherlands. PUMA will remain responsible for the maintenance of the sea defense for another five years after the project completion in 2013. The Maasvlakte 2 area will ultimately encompass a total of 1,000 ha (nett) of industrial complex located directly on deep and navigable water.

Related projects

Selected filters
hfd_onder_header.jpg

Creating two berths pockets, NCIG terminal

For 200 years the Port of Newcastle has been Australia’s premier coal export harbor. Of the 95 Mtpa of various commodities such as steel, aluminum, minerals and so forth exported from Newcastle in 2008-2009, 90.5 Mtpa were attributable to coal. Average annual growth rate of coal exports from 1990 to 2006 was 6.1%. This constant increase has caused a spike in ships queuing to enter the harbour to be loaded. To increase capacity and avoid these traffic jams, a decision was made to develop a new coal stockpile area and construct a third coal terminal.

Balboa_2_header.jpg

Port expansion, Balboa

The plans to expand the Panama Canal represent one of the most important infrastructure improvements of the 21st century. Since its opening in 1913 the Canal has provided the shortest and most economically viable shipping route from Pacific to Atlantic seaports. With the ever-increasing size of modern-day vessels, it was inevitable that the Canal would need to be widened and deepened. The expansion of the Canal has made the extension of the Port of Balboa at the mouth of the canal on the Pacific Ocean a necessity. The Phase 4 projects included Marine Works and Civil Works to improve two existing berths and to build a completely new berth capable of handling not only Post Panamax but also Super Post Panamax ships.

DSCF0226_header.jpg

Land reclamation, North Manama Causeway

The purpose of the project was to provide additional land to accommodate a section of a proposed new highway system to service the area and to relieve congestion on the corniche road. Boskalis appointed Hydronamic (the in-house engineering department of Boskalis) to provide detailed design and on site assistance with supervision of the sub-contractor for the rock works.

Figure_1_header.jpg

Port environmental mitigation measures, Hamina

Hamina, which is close to the Russian border in south-east Finland, is a home port for the oil industry and a transit harbor for timber, cars and other goods on their way to Russia. To provide access for larger vessels it had to deepen the existing channel by two meters to 12 meters and create a new channel section. Terramare Oy, a subsidiary of Royal Boskalis Westminster, won this assignment in late 2008. The project started in July 2009.

Raahe_1_header.jpg

Port development, Raahe

The Raahe project is the largest dredging contract in Finnish history. Access for larger ships is economically important for the clients using the port of Raahe, such as the steel company Ruukki.

_L4F8705_header.jpg

Port development, Pipavav

As a result of the booming container market in recent years, GPPL and APM Terminals introduced a long term investment plan to further develop the port’s facilities. Phase 2 of the expansion program included the reclamation of a new storage (container stacking) area and the extension of the port’s capacity by deepening the approach, channels and berths, allowing larger (container) vessels to enter the port. Zinkcon Marine Singapore, a subsidiary of Boskalis International B.V., won the contract for the dredging and reclamation works for Phase 2. In the beginning of 2009, however, the client re-evaluated the investment against the background of the dramatic effects of the economic crisis, which seriously affected the global container market. GPPL, APMT and ZMS agreed to optimize the project in such a way that all parties would benefit.