To main content

Port expansion,
Maasvlakte 2

PUMA, the Project Organization for the Extension of the Maasvlakte, is a 50/50 joint venture between dredging and marine contractors Boskalis and Van Oord. The consortium has been contracted by the Rotterdam Port Authority to construct the first phase of the Maasvlakte 2 Project – the extension of the Port of Rotterdam – between 2008 and 2013. The new zone will encompass 2,000 hectares of new land, roughly the same size as the total surface area of Schiphol airport. Half of the area will become land for a future business park.

The first phase of Maasvlakte 2 comprises an industrial site area measuring 700 hectares. The port basins are dredged to –20 m NAP (Normal Amsterdam Water Level), so that even the largest (next generation) container vessels can dock. An important component of the project is the construction of the overall sea defenses. The outer contour bordering the sea is about 11 kilometers long, and includes a hard (rocks) and a soft (dunes) section. The 3.5 km hard section requires 20,000 concrete blocks, each weighing approximately 40,000 kg and 7 million tons of broken rock, of which 1.5 million tons is recycled from the existing sea defenses, from Maasvlakte 1, and 5.5 million tons is imported from quarries in North-West Europe (mainly from Norway). PUMA is also managing the construction of the quaywalls, railways and roads for the Maasvlakte 2 project. About 140,000 tons of asphalt, 110.000 tons of mixed aggregate and 112,000 m2 of sandcement stabilisation will be used for the construction of the roads.

'We are pleased and proud as a Dutch company to be involved in this major project in our own country. The Second Maasvlakte confirms the position of the Netherlands as a leading nation in maritime construction.' Peter Berdowski
Boskalis CEO

Conclusion

The construction of Maasvlakte 2 is one of the most high-profile projects in the history of hydraulic engineering. The complexity and the enormous dimensions of the project are unrivalled. The project is carried out according to the highest quality and safety standards, resulting in the lowest Lost Time Injury Frequency (LTIF) figures ever achieved in The Netherlands. PUMA will remain responsible for the maintenance of the sea defense for another five years after the project completion in 2013. The Maasvlakte 2 area will ultimately encompass a total of 1,000 ha (nett) of industrial complex located directly on deep and navigable water.

Related projects

Selected filters

Shell Malikai

Malikai is a deepwater oil discovery in offshore Sabah, Malaysia where Sabah Shell Petroleum Company is the designated Operator. A floating Dry Tree Unit (DTU) will be installed over Malikai field utilizing a Tension Leg Platform (TLP) design that suits the Malikai environment.

FF66817_header.jpg

Coastal development, Hondsbossche and
Pettemer Sea Defense

A joint venture of Boskalis Nederland and Van Oord has been commissioned by the Hollands Noorderkwartier water control board to reinforce the Hondsbossche and Pettemer Sea Defense between the villages of Petten and Camperduin on the coast of the Dutch province of Noord-Holland.

Cornelis_Zanen.jpg

Maintenance dredging, Yangon River

Located close to the city centre on the Yangon River, Yangon Port has been the main port to Myanmar since colonial times. Currently, the port has capacity for vessels of up to 15,000 –20,000 DWT and works are scheduled to increase the port’s capacity for vessels up to 35,000 DWT.

Gabon_Libreville1920.jpg

Port development,
Libreville - Gabon

A new area was constructed in the Port of Libreville for a mineral terminal, dry dock, fishing port, processing facilities and other port activities, such as aggregate processing. This new port development was required to improve and strengthen the logistic capacity for the inland mining industry, to reduce export costs, and thus to increase the competitiveness of mineral exports from Gabon.

Butendiek OWF

Boskalis was contracted by OWP Butendiek GmbH & Co. KG to supply, install and protect (by post-lay burial) the high-voltage inter-array cable at the offshore wind farm of Butendiek. This German wind farm is situated in the German Bight (Nordsea), approx. 35 km west of the island of Sylt. The 33 km2 wind farm consists of 80 wind turbines with a capacity of 3.6 MW each and a total capacity of 288 MW. The inauguration of the wind farm took place on September 8, 2015. It provides renew-able energy to approx. 370,000 households.

IMG_3549_header.jpg

Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.