Subsea pipeline repair, Bukom SBM

The Shell Bukom Refinery on Bukom Island imports the bulk of its crude oil feedstock through a Single Buoy Mooring (SBM) situated approximately 5.2 km from the island in the deeper water necessary to accommodate Very Large Crude Carriers.

The SBM is connected to the shore by a 48” concrete weight coated submarine pipeline. To extend the operating life of this pipeline, a 2.7-km section starting at the Pipeline End Manifold (PLEM) containing most of the corroded spots was replaced. The overall project scope included laying approximately 2.7 kilometers of new pipeline in the re-routed trenched corridor, de-oiling the existing pipeline, removing the existing SBM buoy and PLEM, in-situ inspection of the SBM mooring chains, de-burial, cutting and removal of the existing pipeline at both tie-in locations, installation of the new PLEM, associated tie-in connections between the newly laid pipeline and the existing facilities, re-installation of the SBM, hydro-testing and final leak testing of the modified facilities. The scope was extended to include the removal of the replaced pipeline section. Due to the close proximity to the existing SBM and its mooring chains, soil surveys requiring anchored vessels could not be carried out on a potential hard spot. There was a serious concern that dredging this section would not be possible using the proposed dredging equipment during pipeline outage. Boskalis suggested dredging this particular trench section using the Trailing Suction Hopper Dredger (TSHD) Queen of the Netherlands with a ripper draghead well in advance of the actual trench dredging works. The ripper draghead broke and removed the weathered rock and overlying, stiff to very stiff, clay and gravel.

Related projects

Selected filters
Seahorse_-_Nord_Stream_2032010_header.jpg

Trench dredging gas pipeline, Nord Stream

The Nord Stream gas pipeline project is a joint project of four major companies: Gazprom, BASF/Wintershall, E.ON Ruhrgas and Gasunie. The project is more than just a pipeline. It is a new channel for Russian natural gas exports and a major infrastructure project which is expected to set a new benchmark in EU-Russia cooperation. In view of current developments the new pipeline will be an important factor of energy security in Europe.

D1107-1233_header.jpg

Seabed preparatory works,
Dana Medway

Dana Petroleum Netherlands B.V. is the operator of the Pllb De Ruyter field and oil-producing platform located in the Dutch section of the North Sea.

DPFV_Sandpiper_accompagnied_by_SMIT_tugs_on_her_way__to_worksite_header.jpg

Rock installation, PDET

In 2008 Boskalis was approached by Petrobras to carry out a rock installation project at the oceanic terminal, one of Petrobras’ offshore oil production locations. The terminal, situated at Campos Basin offshore Rio de Janeiro, Brazil, is a maritime complex consisting of one Independent Re-pump Platform (PRA-1), two monobuoys and a FSO vessel which links to a 20 inch gas pipeline system.

Belwind_1_bewerkt_header.jpg

Construction wind farm, Belwind

SMIT sheerlegs Taklift 4 installed the final element for one of Belgium’s first offshore wind farms, Belwind, the wind farm’s high voltage transformer substation. SMIT also provided the transport of the element and other marine support services to assist the construction of the wind farm.

Walney_wind_farm_UK_support_installatie_monopiles_windmolens_header.jpg

Offshore wind farm, Walney

Windfarm construction projects regularly feature in the work programmes of SMIT’s sheerlegs fleet. For example, the Taklift 7 was involved in the Walney Offshore Windfarm development in the Irish Sea. Walney Offshore is a wind farm project developed by DONG in the Irish Sea, some 20 miles from the coast at Barrow.

Magellan_4_header.jpg

Pipeline crossing, Strait of Magellan

The project involved the construction of a new, strategically important, 24" natural gas pipeline across the Strait of Magellan, linking Cabo Espíritu Santo in Tierra del Fuego province with Cabo Vírgenes in Santa Cruz province. The new pipeline was built as an expansion of the existing San Martín pipeline in an effort by the government to increase gas supplies from Tierra del Fuego to the Argentinian mainland.