Tow-out and towage,
FPSO Petrojarl Knarr

Teekay awarded Fairmount Marine, a 100% subsidiary of Boskalis, a contract for the tow-out and towage of the FPSO from Geoje, South Korea to the port of Haugesund in Norway.

FPSO Petrojarl Knarr

The Petrojarl Knarr is one of the world’s largest floating production and storage units (FPSO) for harsh environments. The FPSO is owned by Teekay, a market leader in FPSO solutions for companies that produce oil and gas in deep waters and harsh weather conditions, and it is the company’s largest project to date. Petrojarl Knarr, which was newly built by Samsung Heavy Industries in Geoje, South Korea, is 256.4 m long and 48 m wide with a deadweight of 135,000 tons. It has a production capacity of 63,000 barrels a day and a storage capacity of 800,000 barrels. The FPSO will operate on the Knarr oil and gas field in the Norwegian North Sea for BG Norge.

Project challenges

The main challenges, which were dealt with effectively during project preparation and execution, were: 

  • Weather: The typhoon season in the Northwestern Pacific starts at this time of year. In addition, the Cape of Good Hope was rounded during the local winter. Several weather agencies monitored the weather under way closely and forecasts were used as a basis for decisions by the experienced crew on board. 
  • Towage by three tugs: Well-documented and well-trained procedures were in place specifically for three-tug towage to prevent any unsafe situations during the tow.
  • Logistics: The various scheduled port calls were carefully planned and executed with assistance from local port agents to prevent unnecessary loss of time. 

Conclusion

The FPSO Petrojarl Knarr was towed effectively and safely, despite the distance and weather limitations along the route. With an average speed of 10.74 knots the three Fairmount tugs towed the FPSO more than 16,000 miles from South Korea to Norway in just 61 towing days, which is extremely fast, especially for an FPSO this size. Evaluating the project preparation and execution, it can be concluded that the operational best practices with the experienced crew on board were decisive for the safe, controlled and successful execution of this towage.

Related projects

Selected filters
Ineos_IRM_2018.jpg

Ineos IRM 2018

Boskalis Subsea Services was contracted by INEOS E&P A/S for the 2018 Inspection, Repair and Maintenance (IRM) campaign, involving the preparation and execution of 20-off scopes on various assets.

Haven.jpeg

Haven Jack-up upgrade

The Master Marine accommodation unit HAVEN required an upgrade for operations at the Johan Sverdrup Field.

Oman.jpg

DNO Oman block 8 LTD

DNO Oman Block 8 Ltd (DNO) is the operator of the Bukha Field, offshore Khasab, Oman. DNO entered Oman in 2012 and operates the country's only producing offshore fields on behalf of Omani Oil & Gas ministry. Boskalis Subsea Services (BSS) in recent years have assisted DNO with lifting a flare boom onto the WB Platform, making use of a DP2 offshore vessel, also Boskalis provided diving and inspection services to DNO for their SPM Offshore RAK, UAE.

Offshore_energy_heavy_transport_Dockwise_Vanguard_Aasta_Hansteen.jpg

Transport and installation Aasta Hansteen
spar platform

For the Statoil Aasta Hansteen project, Dockwise has transported the newbuild spar hull from the HHI fabrication yard in Ulsan, South Korea to the offshore discharge location near Høylandsbygd, Norway. The spar is the world’s largest spar ever built to date. 

Offshore_windfarm_heavy_transport_installation_wikinger.jpg

Transport and installation turbine foundations offshore wind farm, Wikinger

The Wikinger offshore wind farm has been developed by Iberdrola in the Baltic Sea area, within the German Exclusive Economic Zone (EEZ). The offshore site is about 34 km northeast of the island of Rügen, and covers an area of roughly 50 km², within which 70 wind turbine generators (WTG) of 5 MW and one offshore substation (OSS) are being installed. The water depths for installation range between 36 and 42 meters. When completed the windfarm will deliver 350 MW electrical power to the German national grid. The transport and installation of the 70 WTG foundations and the piles for the OSS has been carried out by Boskalis.

069dd04102016OWF-_c_Kloet.jpg

Offshore wind farm
monopile installation,
Veja Mate

Boskalis is close to completing one of its latest and most significant offshore wind projects - Veja Mate, in the German North Sea. The project involves handling and installing the biggest monopiles in the industry – weighing between 1,230-1,302-tonne a piece – using the biggest pile gripper frame and pile driving hammers in the industry with a brand new vessel, which also happens to be the biggest in the sector. Once complete, the offshore wind farm will produce over 1,6 TWh of green, renewable electricity annually.