Wintershall Noordzee B.V. installed a new remote platform RAVN as a crude production tie-back to A6-A. RAVN is a remote and unmanned crude well unit. Utilising a dry-tree design, all control, power and metered injection for the well will be via the 18.2-km control umbilical between the new satellite platform RAVN in the Danish sector and the operational platform A6-A in the German sector.

The umbilical forms the entire link between the remote platform, supplying and controlling all functions and ensuring continual feedback and monitoring of RAVN.

The umbilical supplies all the necessary input data, control and feedback to eliminate the usual day-to-day requirements of direct human contact. The umbilical was installed from RAVN first end to second end pull-in at A6-A end. Platforms are located in the Danish territorial waters in the North Sea (RAVN) and German territorial waters in the North Sea (A6-A). The umbilical was connected/pulled into RAVN via a J-tube and internal conductor to the RAVN topside -TUTA. RAVN - first end with pull-in to topside deck via a J-tube - was laid in corridor separate from the 8-inch pipeline between RAVN and A6-A and second end pull-in using the quadrant method at the A6-A platform.

SCOPE OF WORK

  • Prepare project planning for Boskalis’ scope of work.
  • Survey work, including post-burial survey.
  • Perform route engineering and installation engineering to optimize the performance of the installation scope, including Orcaflex analysis for laying, pull-ins, loads and dynamics, as well as a detailed burial assessment study (BAS).
  • Prepare platform on RAVN and A6-A.
  • Define umbilical length together with the client.
  • Umbilical load-out at Hartlepool (UK) onto the installation vessel Ndurance.
  • Installation and hang-off of umbilical termination heads – topsides.
  • Crossing 36- & 40-inch live gas pipelines.
  • Pull-in at RAVN & A6-A platforms – direct from vessel as part of SIM-OPS.
  • Umbilical lay and bury scope – minimize on seabed exposure.
  • Mobilize and demobilize all installation spreads for Boskalis’ scope.
  • Provide engineering support during the offshore umbilical installation, including simultaneous burial.
  • Provide QHSE management for Boskalis’ scope.
  • Process and deliver as-built data.
  • Mobilize and demobilize all installation spreads for Boskalis’ scope.

Related projects

Selected filters
Ineos_IRM_2018.jpg

Ineos IRM 2018

Boskalis Subsea Services was contracted by INEOS E&P A/S for the 2018 Inspection, Repair and Maintenance (IRM) campaign, involving the preparation and execution of 20-off scopes on various assets.

Haven.jpeg

Haven Jack-up upgrade

The Master Marine accommodation unit HAVEN required an upgrade for operations at the Johan Sverdrup Field.

Oman.jpg

DNO Oman block 8 LTD

DNO Oman Block 8 Ltd (DNO) is the operator of the Bukha Field, offshore Khasab, Oman. DNO entered Oman in 2012 and operates the country's only producing offshore fields on behalf of Omani Oil & Gas ministry. Boskalis Subsea Services (BSS) in recent years have assisted DNO with lifting a flare boom onto the WB Platform, making use of a DP2 offshore vessel, also Boskalis provided diving and inspection services to DNO for their SPM Offshore RAK, UAE.

Offshore_energy_heavy_transport_Dockwise_Vanguard_Aasta_Hansteen.jpg

Transport and installation Aasta Hansteen
spar platform

For the Statoil Aasta Hansteen project, Dockwise has transported the newbuild spar hull from the HHI fabrication yard in Ulsan, South Korea to the offshore discharge location near Høylandsbygd, Norway. The spar is the world’s largest spar ever built to date. 

Offshore_windfarm_heavy_transport_installation_wikinger.jpg

Transport and installation turbine foundations offshore wind farm, Wikinger

The Wikinger offshore wind farm has been developed by Iberdrola in the Baltic Sea area, within the German Exclusive Economic Zone (EEZ). The offshore site is about 34 km northeast of the island of Rügen, and covers an area of roughly 50 km², within which 70 wind turbine generators (WTG) of 5 MW and one offshore substation (OSS) are being installed. The water depths for installation range between 36 and 42 meters. When completed the windfarm will deliver 350 MW electrical power to the German national grid. The transport and installation of the 70 WTG foundations and the piles for the OSS has been carried out by Boskalis.

069dd04102016OWF-_c_Kloet.jpg

Offshore wind farm
monopile installation,
Veja Mate

Boskalis is close to completing one of its latest and most significant offshore wind projects - Veja Mate, in the German North Sea. The project involves handling and installing the biggest monopiles in the industry – weighing between 1,230-1,302-tonne a piece – using the biggest pile gripper frame and pile driving hammers in the industry with a brand new vessel, which also happens to be the biggest in the sector. Once complete, the offshore wind farm will produce over 1,6 TWh of green, renewable electricity annually.