Wintershall RAVN and A6-A

Wintershall Noordzee B.V. installed a new remote platform RAVN as a crude production tie-back to A6-A. RAVN is a remote and unmanned crude well unit. Utilising a dry-tree design, all control, power and metered injection for the well will be via the 18.2-km control umbilical between the new satellite platform RAVN in the Danish sector and the operational platform A6-A in the German sector.

The umbilical forms the entire link between the remote platform, supplying and controlling all functions and ensuring continual feedback and monitoring of RAVN.

The umbilical supplies all the necessary input data, control and feedback to eliminate the usual day-to-day requirements of direct human contact. The umbilical was installed from RAVN first end to second end pull-in at A6-A end. Platforms are located in the Danish territorial waters in the North Sea (RAVN) and German territorial waters in the North Sea (A6-A). The umbilical was connected/pulled into RAVN via a J-tube and internal conductor to the RAVN topside -TUTA. RAVN - first end with pull-in to topside deck via a J-tube - was laid in corridor separate from the 8-inch pipeline between RAVN and A6-A and second end pull-in using the quadrant method at the A6-A platform.

SCOPE OF WORK

  • Prepare project planning for Boskalis’ scope of work.
  • Survey work, including post-burial survey.
  • Perform route engineering and installation engineering to optimize the performance of the installation scope, including Orcaflex analysis for laying, pull-ins, loads and dynamics, as well as a detailed burial assessment study (BAS).
  • Prepare platform on RAVN and A6-A.
  • Define umbilical length together with the client.
  • Umbilical load-out at Hartlepool (UK) onto the installation vessel Ndurance.
  • Installation and hang-off of umbilical termination heads – topsides.
  • Crossing 36- & 40-inch live gas pipelines.
  • Pull-in at RAVN & A6-A platforms – direct from vessel as part of SIM-OPS.
  • Umbilical lay and bury scope – minimize on seabed exposure.
  • Mobilize and demobilize all installation spreads for Boskalis’ scope.
  • Provide engineering support during the offshore umbilical installation, including simultaneous burial.
  • Provide QHSE management for Boskalis’ scope.
  • Process and deliver as-built data.
  • Mobilize and demobilize all installation spreads for Boskalis’ scope.

Related projects

Selected filters
005dd16062014Boskalis-_c_Kloet_header.jpg

Transport and installation depletion compression platform,
Malampaya phase 3

The Malampaya Deep Water Gas-to-Power Project is a joint venture involving the Philippine National Oil Company, Chevron and Shell Philippines Exploration. The project is part of the optimization of the Malampaya gas field which will lead to an eight-year lifetime extension.

SMIT_Subsea_Constructor-MaerskOil_Dan_56768_header.jpg

Platform reinforcement, DABRAT

Boskalis Offshore was awarded a contract by Maersk for the DABRAT project, involving both the preparation and construction work to the Dan A and Dan B offshore oil production facilities. The extensive scope not only included the subsea installation and removal work, but also fabrication of structural items, procurement, setting up and testing of lift equipment and structural examinations. The works covered the years 2013 and 2014.

Fairmount_Sherpa_assisted_by_local_harbor_tugs_towing_in_the_FPSO_at_Haugesund_header.jpg

Tow-out and towage,
FPSO Petrojarl Knarr

Teekay awarded Fairmount Marine, a 100% subsidiary of Boskalis, a contract for the tow-out and towage of the FPSO from Geoje, South Korea to the port of Haugesund in Norway.

140718_-_48.jpg

Wintershall L8-P4

Wintershall Noordzee B.V. installed a new remote platform at L6-B as a gas production tie-back to L8-P4. L6-B is a remote and unmanned gas well unit. Utilising a dry-tree design, all control, power and metered injection for the two wells will be via the 19.5-km control umbilical between the new satellite platform L6-B and the operational gas platform L8-P4. 

DONG_Rockpiper_West_of_Duddon_Sands_header.jpg

Wind farm foundation installation, West of Duddon Sands

With 108 wind turbines producing almost 400 megawatts, West of Duddon Sands is one of the larger European wind farms. It is being built by a joint venture of Dong Energy and Scottish Power Renewables. Boskalis Offshore and Volker Stevin Offshore - in an Offshore WindForce joint venture - were responsible for the transport and installation of the 108 foundations for the wind farm.

Java-Bali_header.jpg

Submarine cables, Java-Bali

The island of Bali has been suffering a constant shortage of power. PLN contracted a Consortium of PT. Boskalis International Indonesia, Sumitomo Corporation and J-Power Systems Corporation to procure and install two 150 kV submarine and underground interconnecting power cables to replace existing cables and to reinforce the link between the electricity grids on the Indonesian islands of Java and Bali.