Boskalis provides integrated solutions for a fully operational port - from the development of new ports to the improvement or expansion, maintenance and protection of existing ports. We cover all project phases from (pre-) feasibility and design through to construction, including dredging access channels, environmental monitoring, soil remediation and financing. We offer comprehensive infrastructure solutions (quay walls, roads, railways, tunnels and bridges) and have over a century experience in land reclamation to accommodate it. We also deliver cost-effective sea defense.

Port development – expertise managing complexity

Boskalis has a proven track record delivering complex port development projects. We use our vast experience and expertise to assess the economic and environmental impacts of your project, and manage the numerous disciplines and contractors involved in the design, planning and time-critical construction phase. We specialise in developing greenfield facilities in remote locations with limited access and infrastructure, and a heightened environmental focus.

Port protection – cost-effective, sustainable solutions

Boskalis designs, constructs and maintains breakwaters and revetments to protect your port. This may involve seabed preparation and rock installation. Our expertise in quarry management, logistics and in-situ production of concrete elements, enables us to optimize the construction process to deliver an integrated, cost-effective sea defense. Through our subsidiary Boskalis Hirdes, we can also remove unexploded ordnance.

Port infrastructure – streamlining execution

Ensuring excellent connections with the hinterland requires a wide variety of port infrastructure solutions. We streamline execution by managing subcontractors, communicating with stakeholders, eliminating interfaces and/or acting as a specialist subcontractor. We have the expertise to create new land required for development and new infrastructure.

Involve Boskalis early on and we can improve your processes, mitigate risks, minimize uncertainties and deliver the solutions you seek.

Our port development solutions

port_development.jpg
1
_K9B1947.jpg

Land reclamation through rainbowing

We use various techniques to reclaim land and protect shorelines.

2
dsc-5196.jpg

Environmental monitoring

Environmental opportunities and concerns are incorporated early on.

3
7-juli-2013.jpg

Land reclamation through pump ashore

We use our state-of-the-art fleet of dredging vessels and specialized equipment.

4
brazil-acu-cyrus-1.jpg

Dredging access channel through shore

This technique was put into practice at Açu Port, Brazil.

5
dsc-4696.jpg

Soil improvement by compacting and vertical/horizontal drainage

Cofra is our ground improvement specialist.

6
DSC_0696.jpg

Soil remediation by separation and dewatering plant

Boskalis Environmental processes contaminated dredged material.

7
Causeway.jpg

Land reclamation through bottom doors discharging

One of the techniques we use to reclaim land and protect shorelines.

8
dsc-5830.jpg

Dredging access channel/turning circles/berth pockets

With our fleet of trailing suction hopper dredgers, cutter suction dredgers, backhoes.

9
Scotland-Lerwick.jpg

Drilling, blasting and dredging of hard rock

Boskalis Rock Fall is our specialist in marine drilling and blasting.

Our port protection solutions

port_protection.jpg
1
dsc05207.jpg

Quarry management

We can provide a complete mining package.

2
CIMG1866_pano.jpg

Concrete blocks fabrication

For the Cotonou project Xbloc elements were produced under our own management

3
DSC_2597.jpg

Revetment design, construction and maintenance

4
1-januari-2013.jpg

Transportation of rock to site

5
corporate-brochure-maasvlakte-2__1_.jpg

Breakwater design, construction and maintenance

6
Profiling_Eastern_Revetment.jpg

Detached breakwater design, construction and maintenance

Seabed preparation and rock installation can be essential activities.

7

Clearance of unexploded ordnance

Boskalis Hirdes EOD Services has in-depth knowledge and extensive experience.

Our port infrastructure solutions

port_infra.jpg
1

Combi-wall design, construction and maintenance

2

Retaining wall design, construction and maintenance

3
7-juli-2013.jpg

Land reclamation

We use various techniques to reclaim land and protect shorelines with our versatile fleet.

4

Blockwall design, construction and maintenance

Foundation preparation and installation of scour protection and blocks.

5
Small-netherlands-mv2-roads-rails.jpg

Construction of rail(roads), tunnels and bridges

Our projects

Selected filters
_Group_4_-_DSC7015__DSC7024-3_images_header.jpg

Port development, Tanger Med 2

Tanger-Med is a cargo and passenger port located about 40 km east of Tangiers, Morocco, on the Straits of Gibraltar at the crossing of two major maritime routes only 15 km from the European mainland.

TSHD_Cornelis_Zanen_rainbowing_header.jpg

Port upgrade, Pointe Noire

The rehabilitation of the Port of Pointe-Noire focused on the renovation and upgrading of the main infrastructure of the port and its adaptation to developments in containerized traffic, offering a draught of -15 m. Furthermore, the work included the construction of a protective berm, an extension of the external breakwater, the rehabilitation and extension of quays, and dredging work.

19DS9430_12-11-26_005_header.jpg

Construction LNG port, Swinoujscie

The protective breakwater for Swinoujscie External Port comprises a 3 km long breakwater and groyne for a new outer harbor construction to facilitate a LNG tanker berth and other related activities in the Baltic Sea. The construction of the breakwater took 2 ½ years and was completed in December 2012. Boskalis International B.V. was the leader of a consortium consisting of Boskalis International B.V., Hochtief, Aarsleff and Doraco.

Aeroview_D1207-944_header.jpg

Port expansion,
Maasvlakte 2

PUMA, the Project Organization for the Extension of the Maasvlakte, is a 50/50 joint venture between dredging and marine contractors Boskalis and Van Oord. The consortium has been contracted by the Rotterdam Port Authority to construct the first phase of the Maasvlakte 2 Project – the extension of the Port of Rotterdam – between 2008 and 2013. The new zone will encompass 2,000 hectares of new land, roughly the same size as the total surface area of Schiphol airport. Half of the area will become land for a future business park.

Gbaran_Ubie_filter_placement_header.jpg

Riverbed and slope protection, Gbaran Ubie

The Shell Petroleum Development Company of Nigeria Limited (SPDC) has constructed a gas processing facility in the Niger Delta on the outside bank of a bend of the River Nun at Gbaran Ubie, north of Yenagoa. To facilitate the importation of the processing modules, a Materials Offloading Quay was constructed, including a ro-ro ramp, a passenger jetty and a fire water station.

Costa_Concordia_18012012_DSC_0058_header.jpg

Fuel removal, Costa Concordia

On Friday the 13th of January 2012 the cruise vessel Costa Concordia, carrying over 4,000 passengers and crew, hit a rock and subsequently encountered stability problems, whilst passing the Isle of Giglio in Tuscany. Eventually the Costa Concordia grounded and listed to approximately 56° on her starboard side. Fortunately, the majority of the passengers and crew were safely evacuated yet as it turned out later, 32 people regrettably lost their lives.