Around 80% of world trade is carried by the international shipping industry. Seaborne trade is expected to continue to grow. At the same time container ships, bulk carriers, tankers and cruise vessels get larger. For these reasons ports have to increase their draft and handling capacity and improve efficiency.

Boskalis designs and develops new ports, or deepens, expands and maintains existing ports for governments and port operators around the world. We utilize our wealth of experience applying dredging and earthmoving expertise, at times combined with civil engineering. In addition, Boskalis also transports port-related equipment such as container cranes. Through SMIT and its joint ventures, we are a global leader in providing day-to-day in-port services such as harbor towage and salvage.

What sets us apart

corporate-brochure-maasvlakte-6.jpg

Our ability to manage complexity

We have a proven track record delivering a wide variety of demanding projects from (pre-)feasibility and design through to construction.

Dredging_port_construction_hopper.jpg

Unique range of integrated maritime services

Through optimal deployment of our unique range of expertise, vessels and activities, we realize complex infrastructure projects and provide in-port services around the world.

DSC_8016.jpg

Our commitment to safety and sustainability

Both our progressive safety program and our environmental expertise are held in high regard.

20120223-SDS_2838.jpg

A team built around your needs

With 10,700 experts, Boskalis has the resources to build a global team to meet the challenges you face.

Our projects

Selected filters
gavle_hamn_201319_DD_Bewerkt_header.jpg

Port extension, Port of Gävle

The Port of Gävle is located on the east coast of Sweden in the Gulf of Bothnia, facilitating Swedish imports and exports. The client wished to improve maritime safety and accessibility, and to increase the throughput of goods in this harbor.

20120229-DSC_3214_header.jpg

Port expansion, Onne

In May 2011 Boskalis was awarded the project for the expansion of the Federal Lighter Terminal and Federal Ocean Terminal of the Onne Port Complex by Prodeco International Limited. The project entails the reclamation of approximately 200 ha with suitable materials from nearby borrow areas.

Boskalis_Genova_VOLO_ph-merlo_110112-3725_header.jpg

Port upgrade, Genoa

The deepening and extension of the port of Genoa is needed to accommodate the larger container vessels and the ferries of MSC. The client is the Port Authority of Genoa. The project is being executed by Boskalis Italia S.r.l. in a joint venture with Tecnis S.p.A., an Italian company that is responsible for the construction work.

B_nieuw_header.jpg

Port and MOF, LNG plant Barrow Island, Gorgon

Design and construction of a new port and materials offloading facility in a class 'A' nature reserve. The project owner is developing LNG process facilities on Barrow Island off the north west coast of Western Australia approximately 140 km west of Dampier and 95 km north east of Onslow. Barrow Island is a Class A Nature Reserve and an internationally important conservation estate.

44_Legs_stored_on_deck_SEP_Orion_and_ready_for_tow_out_header.jpg

Salvage operation,
Sep Orion

In 2012 SMIT Salvage successfully removed the diesel oil from the grounded jack-up work platform SEP Orion at Sao Luis, Brazil. SMIT Salvage was also awarded the wreck removal contract.

DSC_5770_header.jpg

Port development, Mombasa

The Port of Mombasa is currently the biggest port on the coast of East Africa north of Durban, and the only international port in Kenya. It is now in the throes of a huge expansion drive to both increase cargo handling capacity and accommodate Panamax and Post Panamax vessels. The port is a transit route for, mainly, Uganda, Rwanda, South Sudan and Northern Tanzania. The current container terminal has an installed capacity of 250,000 TEU but handled more than 770,000 TEU in 2011. The port will raise its profile as a regional hub by building a second container terminal with a capacity of 1.2 million TEU. The port authority decided to construct the container terminal in phases.