To main content

Ports

Around 80% of world trade is carried by the international shipping industry. Seaborne trade is expected to continue to grow. At the same time container ships, bulk carriers, tankers and cruise vessels get larger. For these reasons ports have to increase their draft and handling capacity and improve efficiency.

Boskalis designs and develops new ports, or deepens, expands and maintains existing ports for governments and port operators around the world. We utilize our wealth of experience applying dredging and earthmoving expertise, at times combined with civil engineering. In addition, Boskalis also transports port-related equipment such as container cranes. Through SMIT and its joint ventures, we are a global leader in providing day-to-day in-port services such as harbor towage and salvage.

What sets us apart

corporate-brochure-maasvlakte-6.jpg

Our ability to manage complexity

We have a proven track record delivering a wide variety of demanding projects from (pre-)feasibility and design through to construction.

Dredging_port_construction_hopper.jpg

Unique range of integrated maritime services

Through optimal deployment of our unique range of expertise, vessels and activities, we realize complex infrastructure projects and provide in-port services around the world.

DSC_8016.jpg

Our commitment to safety and sustainability

Both our progressive safety program and our environmental expertise are held in high regard.

20120223-SDS_2838.jpg

A team built around your needs

With 10,700 experts, Boskalis has the resources to build a global team to meet the challenges you face.

Our projects

Selected filters
24012008_PLUTO_CSD_Phoenix__Samson_101_header.jpg

Dredging and construction, Pluto LNG project

The Pluto LNG project is located about 190 km northwest of the coastal town Karratha, in the Northern Carnarvon Basin, Western Australia. The project is a joint venture between Woodside Burrup Pty. Ltd., the operator, with a 90% interest, and Tokyo Gas (5%) and Kansai Electric (5%). The A$12 bn project will process gas from the Pluto and neighboring Xena gasfields.

hfd_onder_header.jpg

Creating two berths pockets, NCIG terminal

For 200 years the Port of Newcastle has been Australia’s premier coal export harbor. Of the 95 Mtpa of various commodities such as steel, aluminum, minerals and so forth exported from Newcastle in 2008-2009, 90.5 Mtpa were attributable to coal. Average annual growth rate of coal exports from 1990 to 2006 was 6.1%. This constant increase has caused a spike in ships queuing to enter the harbour to be loaded. To increase capacity and avoid these traffic jams, a decision was made to develop a new coal stockpile area and construct a third coal terminal.

Balboa_2_header.jpg

Port expansion, Balboa

The plans to expand the Panama Canal represent one of the most important infrastructure improvements of the 21st century. Since its opening in 1913 the Canal has provided the shortest and most economically viable shipping route from Pacific to Atlantic seaports. With the ever-increasing size of modern-day vessels, it was inevitable that the Canal would need to be widened and deepened. The expansion of the Canal has made the extension of the Port of Balboa at the mouth of the canal on the Pacific Ocean a necessity. The Phase 4 projects included Marine Works and Civil Works to improve two existing berths and to build a completely new berth capable of handling not only Post Panamax but also Super Post Panamax ships.

Figure_1_header.jpg

Port environmental mitigation measures, Hamina

Hamina, which is close to the Russian border in south-east Finland, is a home port for the oil industry and a transit harbor for timber, cars and other goods on their way to Russia. To provide access for larger vessels it had to deepen the existing channel by two meters to 12 meters and create a new channel section. Terramare Oy, a subsidiary of Royal Boskalis Westminster, won this assignment in late 2008. The project started in July 2009.

Raahe_1_header.jpg

Port development, Raahe

The Raahe project is the largest dredging contract in Finnish history. Access for larger ships is economically important for the clients using the port of Raahe, such as the steel company Ruukki.

Full__City_header.jpg

Salvage operation, Full City

On July 30, 2009 bulk carrier Full City, (in ballast and at anchor off the port of Langesund, Norway, awaiting her berth) was trapped in a sudden storm, causing her anchor to drag. She went aground off the port of Langesund. This vessel was refloated by a SMIT Salvage team in mid-August, following the successful completion of a challenging operation.