Installation topside
and living quarters,
Thien Ung BK-TNG

For the Vietsovpetro Thien Ung project, Boskalis has installed the Thien Ung BK-TNG 4,200 metric tonne (mt) topside and 850 mt living quarter by offshore heavy lifting with the sheerleg Asian Hercules III. It was the world’s heaviest lift installation of a topside by a sheerleg in an offshore environment to date. 

Boskalis successfully executed the lifting of the 4,200 mt Thien Ung topside followed by a 850 mt living quarters. The topside and living quarters were installed on a (preinstalled) jacket in the Nam Con Son Basin, at a water depth of 120 meters. The topside lift, which is the heaviest offshore lift by a sheerleg was successfully completed on 21 September 2016 and the living quarters on 24 September 2016. The project was performed by the Asian Hercules III which is a 5,000 mt sheerleg operated by Asian Lift, a joint venture company between Boskalis and Keppel.

Scope

  • Installation engineering, comprising of lifting analysis, rigging design, mooring analysis
  • Preparation and mobilization of Asian Hercules III
  • Anchor pattern set-up and interface with transport barges
  • Lift and install of 4,200 mt topside and 850 mt living quarters
  • Demobilization of Asian Hercules III and reinstatement


Project challenges

It is the first offshore project for Asian Hercules III. The project was also executed in an extremely fast track manner to avoid the offshore installation period slipping into the monsoon months.


NINA

The project was executed without incident. The NINA initiative was not only inculcated within the Boskalis PMT and Asian Lift but also with WL Management and Vietsovpetro.


Conclusion

The success of the project was due to the strong cooperation between all parties. In spite of the short preparation and execution time, a strong focus on engineering, safety and sound operational excellence ensured the timely completion of this project.

Related projects

Selected filters
Seahorse_-_Nord_Stream_2032010_header.jpg

Trench dredging gas pipeline, Nord Stream

The Nord Stream gas pipeline project is a joint project of four major companies: Gazprom, BASF/Wintershall, E.ON Ruhrgas and Gasunie. The project is more than just a pipeline. It is a new channel for Russian natural gas exports and a major infrastructure project which is expected to set a new benchmark in EU-Russia cooperation. In view of current developments the new pipeline will be an important factor of energy security in Europe.

D1107-1233_header.jpg

Seabed preparatory works,
Dana Medway

Dana Petroleum Netherlands B.V. is the operator of the Pllb De Ruyter field and oil-producing platform located in the Dutch section of the North Sea.

DPFV_Sandpiper_accompagnied_by_SMIT_tugs_on_her_way__to_worksite_header.jpg

Rock installation, PDET

In 2008 Boskalis was approached by Petrobras to carry out a rock installation project at the oceanic terminal, one of Petrobras’ offshore oil production locations. The terminal, situated at Campos Basin offshore Rio de Janeiro, Brazil, is a maritime complex consisting of one Independent Re-pump Platform (PRA-1), two monobuoys and a FSO vessel which links to a 20 inch gas pipeline system.

Belwind_1_bewerkt_header.jpg

Construction wind farm, Belwind

SMIT sheerlegs Taklift 4 installed the final element for one of Belgium’s first offshore wind farms, Belwind, the wind farm’s high voltage transformer substation. SMIT also provided the transport of the element and other marine support services to assist the construction of the wind farm.

Walney_wind_farm_UK_support_installatie_monopiles_windmolens_header.jpg

Offshore wind farm, Walney

Windfarm construction projects regularly feature in the work programmes of SMIT’s sheerlegs fleet. For example, the Taklift 7 was involved in the Walney Offshore Windfarm development in the Irish Sea. Walney Offshore is a wind farm project developed by DONG in the Irish Sea, some 20 miles from the coast at Barrow.

Magellan_4_header.jpg

Pipeline crossing, Strait of Magellan

The project involved the construction of a new, strategically important, 24" natural gas pipeline across the Strait of Magellan, linking Cabo Espíritu Santo in Tierra del Fuego province with Cabo Vírgenes in Santa Cruz province. The new pipeline was built as an expansion of the existing San Martín pipeline in an effort by the government to increase gas supplies from Tierra del Fuego to the Argentinian mainland.