NASR full field development

Boskalis was subcontracted to install 2 topsides and 3 jackets in the NASR and Umm Shait oil fields: The Accommodation Platform/AP Jacket, the Separation Platform/SP Jacket and the Gas Treatment Platform/GTP Jacket are installed in the NASR Field. The installed net weights of the jackets ranged from 2,270 to 3,070 metric tons.

The floating sheerleg Asian Hercules 3, a 5,000 metric tons heavy lift vessel, was mobilized to Abu Dhabi in 2017 for the jacket installations, thereafter demobilized to NW-Europe for other work and then re-mobilized to Abu Dhabi in 2018 for the topside installations. Asian Hercules 3 and supporting marine spread underwent a strict third-party certification regime to comply with ADMA-OPCO specifications. Project personnel and crew was trained and certified to be able to work in the ADMA OPCO fields. The jackets were fabricated in Shenzhen, China where the lifting rigging for the jackets was preinstalled under Boskalis supervision. The Topsides were fabricated in Ulsan, Korea where the lifting rigging on the topsides was pre-installed under Boskalis supervision. Heavy Transport Vessels were used for the transport of the jackets and topsides to Abu Dhabi. These were equipped with additional mooring winches to enable a safe mooring in the congested NASR and Umm Shaif fields, required for the lift off operations. The Asian Hercules 3 mooring system was modified for the use of Dyneema® mooring ropes, which had to be connected to 75 t piggy backed gravity anchors. The mooring operations and installation lifts went smoothly and provided a quick, safe and successful installation of the 3 jackets and 2 topsides for our customer and end client.

Related projects

Selected filters
D1107-1233_header.jpg

Seabed preparatory works,
Dana Medway

Dana Petroleum Netherlands B.V. is the operator of the Pllb De Ruyter field and oil-producing platform located in the Dutch section of the North Sea.

DPFV_Sandpiper_accompagnied_by_SMIT_tugs_on_her_way__to_worksite_header.jpg

Rock installation, PDET

In 2008 Boskalis was approached by Petrobras to carry out a rock installation project at the oceanic terminal, one of Petrobras’ offshore oil production locations. The terminal, situated at Campos Basin offshore Rio de Janeiro, Brazil, is a maritime complex consisting of one Independent Re-pump Platform (PRA-1), two monobuoys and a FSO vessel which links to a 20 inch gas pipeline system.

Belwind_1_bewerkt_header.jpg

Construction wind farm, Belwind

SMIT sheerlegs Taklift 4 installed the final element for one of Belgium’s first offshore wind farms, Belwind, the wind farm’s high voltage transformer substation. SMIT also provided the transport of the element and other marine support services to assist the construction of the wind farm.

Walney_wind_farm_UK_support_installatie_monopiles_windmolens_header.jpg

Offshore wind farm, Walney

Windfarm construction projects regularly feature in the work programmes of SMIT’s sheerlegs fleet. For example, the Taklift 7 was involved in the Walney Offshore Windfarm development in the Irish Sea. Walney Offshore is a wind farm project developed by DONG in the Irish Sea, some 20 miles from the coast at Barrow.

Magellan_4_header.jpg

Pipeline crossing, Strait of Magellan

The project involved the construction of a new, strategically important, 24" natural gas pipeline across the Strait of Magellan, linking Cabo Espíritu Santo in Tierra del Fuego province with Cabo Vírgenes in Santa Cruz province. The new pipeline was built as an expansion of the existing San Martín pipeline in an effort by the government to increase gas supplies from Tierra del Fuego to the Argentinian mainland.

TR_Giant_4_header.jpg

Offshore wind farm, Sprogø

On behalf of marine contractor Aarsleff, SMIT was involved in the construction of the new Sprogø Offshore Windfarm, west of Copenhagen.