Port expansion, Tuas Mega Port Singapore

Boskalis is part of a consortium that won a contract related to the construction of the Tuas Mega Port in Singapore. After Shanghai, Singapore is not only the world's largest container port, it also handles 50% of global crude oil production and it is the planet's busiest transit port. The port is the economic motor of Singapore, which is constantly struggling with a shortage of land.

The land reclamation project is intended to tackle  the fragmentation of all the numerous port activities. All five of the present container terminals, with a joint handling capacity of 35 million containers a year, will be shut down by 2027. After that work will start on the current terminal locations so that they can accommodate offices and homes. The newly-built port area will have a capacity of 65 million containers annually. By concentrating all the handling activities in a single location, the number of transport movements in Singapore will be drastically reduced, cutting the burden on the road network and the environment. The Tuas Mega Port will be equipped with the most advanced handling technologies. Our client, Jurong Town Corporation, granted the first phase of the project, Tuas Finger One, to a consortium comprising Hyundai, Samsung, Penta Ocean, Boskalis and Van Oord. The consortium will execute dredging work and build 3.4 kilometers of quay wall. The work has begun in 2014, and it will be completed in late 2018.

Related projects

Selected filters
FF66817_header.jpg

Coastal development, Hondsbossche and
Pettemer Sea Defense

A joint venture of Boskalis Nederland and Van Oord has been commissioned by the Hollands Noorderkwartier water control board to reinforce the Hondsbossche and Pettemer Sea Defense between the villages of Petten and Camperduin on the coast of the Dutch province of Noord-Holland.

Cornelis_Zanen.jpg

Maintenance dredging, Yangon River

Located close to the city centre on the Yangon River, Yangon Port has been the main port to Myanmar since colonial times. Currently, the port has capacity for vessels of up to 15,000 –20,000 DWT and works are scheduled to increase the port’s capacity for vessels up to 35,000 DWT.

Gabon_Libreville1920.jpg

Port development,
Libreville - Gabon

A new area was constructed in the Port of Libreville for a mineral terminal, dry dock, fishing port, processing facilities and other port activities, such as aggregate processing. This new port development was required to improve and strengthen the logistic capacity for the inland mining industry, to reduce export costs, and thus to increase the competitiveness of mineral exports from Gabon.

Butendiek OWF

Boskalis was contracted by OWP Butendiek GmbH & Co. KG to supply, install and protect (by post-lay burial) the high-voltage inter-array cable at the offshore wind farm of Butendiek. This German wind farm is situated in the German Bight (Nordsea), approx. 35 km west of the island of Sylt. The 33 km2 wind farm consists of 80 wind turbines with a capacity of 3.6 MW each and a total capacity of 288 MW. The inauguration of the wind farm took place on September 8, 2015. It provides renew-able energy to approx. 370,000 households.

IMG_3549_header.jpg

Cleanup sediment treatment, Fox river

As a result of industrialization the riverbed of the Fox River (Wisconsin, USA) had become contaminated with PCBs (polychlorinated biphenyls). Joining together a number of large paper mills based on the banks of the river have established the Fox River Cleanup Group to handle the remediation project. The site is on the federal Superfund program’s National Priorities List.

Large-12_overige_financiele_ontwikkelingen.jpg

Cieg GJ1 Cable repair

Channel Islands Electricity Grid, a joint venture between Jersey Electricity and Guernsey Electricity operate several interconnecting power cable systems (power and telecom) between Jersey, Guernsey and France. Both Jersey and Guernsey rely upon the services of these interconnecting power cables and as a consequence there is a demand to reduce the possible effects and impact of failure to these interconnecting power cables. Boskalis were contracted to conduct a preemptive repair replacing a section of cable including the installation two subsea joints on the Guernsey Jersey circuit, close to Havelet bay.