Malikai is a deepwater oil discovery in offshore Sabah, Malaysia where Sabah Shell Petroleum Company is the designated Operator. A floating Dry Tree Unit (DTU) will be installed over Malikai field utilizing a Tension Leg Platform (TLP) design that suits the Malikai environment.

The 27,500 MT Malikai TLP is to be located about 110 km off the shore of Sabah (East Malaysia) in the South China Sea in water depth about 500 m. Boskalis was awarded a contract in 2014 for the provision of the Heay Transport Vessel (HTV) for loadout and float-off package of the Project which includes loadout of the Integrated Malikai TLP from MMHE fabrication Yard into HTV, Dry-transport to Johor Buoy, Float-off, Tow back and Re-delivery to TMJV at MMHE fabrication yard.

SCOPE

  • Loadout, Transport and Float-off Engineering
  • Design, construct and installation of grillages, skid beams and seafastening Preparation and Mobilization of White Marlin
  • Ballasting of the HTV during the skidded loadout operation
  • Provision of marine spread for the float off operation
  • Demobilization of White Marlin and reinstatement

PROJECT CHALLENGES
Technical challenges included the ability to adapt and successfully perform:

  • The discharge of the TLP offshore in Desaru instead of the original location of Johor Port;
  • The loadout of the integrated TLP ballasted instead of un-ballasted prior to loadout
  • The outfit of a HTV in Vietnam for the first time

NINA
The project was executed without incident. The NINA initiative was not only inculcated within the Boskalis PMT but also with key subcontractors.

CONCLUSION
The success of the project was due to the strong colaboration between all parties. The loadout oper-ation had several difficult challenges; technically and operationally. However, this was all resolved through communica-tion and the close cooperation between TMJV and Boskalis, which ensured that the TLP was still loaded in a safe, operationally sound and timely manner.

Related projects

Selected filters
CIMG1866_header.jpg

Coastline fixation, Cotonou

The project was developed to arrest coastline erosion in the densely-populated centre of Cotonou caused by two phenomena: erosion and human interference along the West African coastline.

gavle_hamn_201319_DD_Bewerkt_header.jpg

Port extension, Port of Gävle

The Port of Gävle is located on the east coast of Sweden in the Gulf of Bothnia, facilitating Swedish imports and exports. The client wished to improve maritime safety and accessibility, and to increase the throughput of goods in this harbor.

20120229-DSC_3214_header.jpg

Port expansion, Onne

In May 2011 Boskalis was awarded the project for the expansion of the Federal Lighter Terminal and Federal Ocean Terminal of the Onne Port Complex by Prodeco International Limited. The project entails the reclamation of approximately 200 ha with suitable materials from nearby borrow areas.

Boskalis_Genova_VOLO_ph-merlo_110112-3725_header.jpg

Port upgrade, Genoa

The deepening and extension of the port of Genoa is needed to accommodate the larger container vessels and the ferries of MSC. The client is the Port Authority of Genoa. The project is being executed by Boskalis Italia S.r.l. in a joint venture with Tecnis S.p.A., an Italian company that is responsible for the construction work.

B_nieuw_header.jpg

Port and MOF, LNG plant Barrow Island, Gorgon

Design and construction of a new port and materials offloading facility in a class 'A' nature reserve. The project owner is developing LNG process facilities on Barrow Island off the north west coast of Western Australia approximately 140 km west of Dampier and 95 km north east of Onslow. Barrow Island is a Class A Nature Reserve and an internationally important conservation estate.

DSC_5770_header.jpg

Port development, Mombasa

The Port of Mombasa is currently the biggest port on the coast of East Africa north of Durban, and the only international port in Kenya. It is now in the throes of a huge expansion drive to both increase cargo handling capacity and accommodate Panamax and Post Panamax vessels. The port is a transit route for, mainly, Uganda, Rwanda, South Sudan and Northern Tanzania. The current container terminal has an installed capacity of 250,000 TEU but handled more than 770,000 TEU in 2011. The port will raise its profile as a regional hub by building a second container terminal with a capacity of 1.2 million TEU. The port authority decided to construct the container terminal in phases.