To main content

Coastline fixation, Cotonou

The project was developed to arrest coastline erosion in the densely-populated centre of Cotonou caused by two phenomena: erosion and human interference along the West African coastline.

After Contract award, the first production and installation activities began in June 2012. Construction was completed in July 2014. The project scope encompassed the supply of the materials and the construction of seven groins (EPIs), a revetment with an approximate length of 300 meters, and a breakwater. A total of 2,680 meters of groin, revetment or breakwater have been built and 7.5 kilometers of coastline have been fixated. The materials supplied consisted of:

  • 2,441 concrete Xblocs measuring 4 m3
  • 32,000 m2 of geotextile
  • 530,000 tonnes of rock of miscellaneous categories.

Including concrete aggregates, 545,000 tonnes of raw rock material corresponding to 21,750 truckloads was transported to the site, approximately 3,500 tonnes of cement in 137 twenty-foot containers was transported to the site. The Xbloc elements were produced under our own management using in-house expertise. A concrete laboratory was imported and operated by in-house personnel to ensure close quality monitoring and compliance with the specifications. Boskalis staff supervised the quarry operations. The quarries were located approximately 180 kilometers inland. Boskalis was responsible for loading from the stockpiles in the quarries. The installation spread consisted of one Hitachi 1200, three Caterpillar 385s, three wheelloaders Caterpillar 980, two Caterpillar 365s and four Caterpillar 740 dumpers.

Related projects

Selected filters
TSHD_Cornelis_Zanen_rainbowing_header.jpg

Port upgrade, Pointe Noire

The rehabilitation of the Port of Pointe-Noire focused on the renovation and upgrading of the main infrastructure of the port and its adaptation to developments in containerized traffic, offering a draught of -15 m. Furthermore, the work included the construction of a protective berm, an extension of the external breakwater, the rehabilitation and extension of quays, and dredging work.

DSC_0602_header.jpg

Land reclamation artificial island, Punta Pacifica

The shoreline of Panama has increasingly become densely populated and, as the economy has boomed over the past 10 years, there is strong demand for high-end products. The real-estate market has taken a revolutionary step with the completion of the the first artificial real-estate island in the Americas.

19DS9430_12-11-26_005_header.jpg

Construction LNG port, Swinoujscie

The protective breakwater for Swinoujscie External Port comprises a 3 km long breakwater and groyne for a new outer harbor construction to facilitate a LNG tanker berth and other related activities in the Baltic Sea. The construction of the breakwater took 2 ½ years and was completed in December 2012. Boskalis International B.V. was the leader of a consortium consisting of Boskalis International B.V., Hochtief, Aarsleff and Doraco.

Aeroview_D1207-944_header.jpg

Port expansion,
Maasvlakte 2

PUMA, the Project Organization for the Extension of the Maasvlakte, is a 50/50 joint venture between dredging and marine contractors Boskalis and Van Oord. The consortium has been contracted by the Rotterdam Port Authority to construct the first phase of the Maasvlakte 2 Project – the extension of the Port of Rotterdam – between 2008 and 2013. The new zone will encompass 2,000 hectares of new land, roughly the same size as the total surface area of Schiphol airport. Half of the area will become land for a future business park.

Gbaran_Ubie_filter_placement_header.jpg

Riverbed and slope protection, Gbaran Ubie

The Shell Petroleum Development Company of Nigeria Limited (SPDC) has constructed a gas processing facility in the Niger Delta on the outside bank of a bend of the River Nun at Gbaran Ubie, north of Yenagoa. To facilitate the importation of the processing modules, a Materials Offloading Quay was constructed, including a ro-ro ramp, a passenger jetty and a fire water station.

8620740517_e75a0d7703_o_1__header.jpg

Reinforcing Dutch
coastline, Sandmotor

In December 2010 Royal Boskalis Westminster N.V. was awarded a contract by the Dutch Directorate General for Public Works and Water Management to reinforce part of the coastline in the province of Zuid-Holland by creating a ‘sand engine’. The total value of the contract is EUR 50 million for the Van Oord- Boskalis consortium, in which Boskalis has a 50% stake.