Submarine cables, Java-Bali

The island of Bali has been suffering a constant shortage of power. PLN contracted a Consortium of PT. Boskalis International Indonesia, Sumitomo Corporation and J-Power Systems Corporation to procure and install two 150 kV submarine and underground interconnecting power cables to replace existing cables and to reinforce the link between the electricity grids on the Indonesian islands of Java and Bali.

The cables have the capability to transfer power at 130 MVA per circuit. This project will provide enough additional power to solve Bali's shortage and facilitate the further development of a popular tourist destination, which attracts around 2.3 million tourists each year. Boskalis’ scope ran roughly from the high water mark at Ketapang, Java, to the high water mark at Gilimanuk, Bali and involved the installation of the two submarine cables, including four cable landings. After cable installation, both cables had to be covered with a rock berm over nearly the entire length of the routes. The newly built Cable Laying Vessel (CLV) Ndurance was deployed for the cable installation.

Engineering

One of the most complicating factors was the extremely strong current which occurs in the Bali Strait. Boskalis’ in-house engineering company Hydronamic was involved to analyze the most efficient installation method and period. Based on a current measurement campaign, which lasted over one year, the most favorable installation window was determined. Since Boskalis was also responsible for the cable routes design, an extensive hydrographic survey was undertaken to map the seafloor. This survey and the design parameters specified by the Client were used to design the optimum cable routes, taking the properties of the cables into account. Mitigation of free spans and vortex induced vibrations (VIV) formed part of the engineering work, coordinated by Boskalis' affiliate VBMS. To assess the station keeping capabilities of the Ndurance at this specific location with very strong currents, a series of simulations was performed at the Marin ship simulator. Based on these simulations, it was decided to have an Azimuth Stern Drive (ASD) tug boat stand-by in the direct vicinity of the CLV during cable lay operations to avoid any risk for crew, vessel and cable. Extensive sea trials were undertaken in Singapore and on site to practice and determine the behavior of the Ndurance and the combination of CLV and ASD tug.

Related projects

Selected filters
TSHD_Queen_of_the_Netherlands_dredging_hard_spot_close_to_the_existing_SPM_header.jpg

Subsea pipeline repair, Bukom SBM

The Shell Bukom Refinery on Bukom Island imports the bulk of its crude oil feedstock through a Single Buoy Mooring (SBM) situated approximately 5.2 km from the island in the deeper water necessary to accommodate Very Large Crude Carriers.

131007_1_Sunset_in_the_field_header.jpg

Mooring installation and hook-up, OSX3

OGX - OSX is a Brazilian oil and gas company owning and operating several floating facilities in Brazil. MODEC secured the FPSO purchase contract and subsequently awarded Boskalis the Mooring Installation & Hook-up contract. The FPSO had to be installed in the Tubarão Martelo Field, located in the Campos Basin, Brazil, in 105 meters water depth.

IMG_0814_header.jpg

Dredging, Sealine COEFR

The Crude Oil Export Facility Reconstruction (COEFR) Project aims to stabilize and expand Iraq’s crude oil export capacity, a lifeline of the Iraqi economy, by constructing a pipeline connecting crude oil storage facilities to the offshore crude oil export terminal in Fao, Basrah in Southern Iraq. The Project involves the development of two offshore valve station platforms, a 75 kilometer 48” oil pipeline and a Single Point Mooring system.

NWS_Barge_near_completion_header.jpg

Refurbishment water station, Olero Creek

In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration Project (OCR) is a 70 million US$ construction and commissioning subcontract. The scope of work is the refurbishment and reinstatement of the North Water Station (NWS) and its hook up to the interconnecting piping at Olero Creek.

Provision and installation of submarine fiber optic cable, Strait of Magellan

In September 2011 Boskalis was awarded a contract worth approximately EUR 30 million to provide and install a submarine fiber optic cable across the Strait of Magellan, Argentina. The contract was awarded by the state-owned corporation AR-SAT (Empresa Argentina de Soluciones Satelitales S.A.).

PAG_9_TRANSPORT_FLEET_SUPPORTS_LINCS_WINDFARM_CONSTRUCTION_-_Groot_header.jpg

Offshore wind farm, LINCS

SMIT Transport is transporting the wind turbine foundations for the new Lincs Offshore Windfarm, situated off Great Yarmouth, UK. When completed, the windfarm will consist of 75 turbines capable of generating sufficient power to meet the annual demand of some 200,000 households.