Teekay awarded Fairmount Marine, a 100% subsidiary of Boskalis, a contract for the tow-out and towage of the FPSO from Geoje, South Korea to the port of Haugesund in Norway.

FPSO Petrojarl Knarr

The Petrojarl Knarr is one of the world’s largest floating production and storage units (FPSO) for harsh environments. The FPSO is owned by Teekay, a market leader in FPSO solutions for companies that produce oil and gas in deep waters and harsh weather conditions, and it is the company’s largest project to date. Petrojarl Knarr, which was newly built by Samsung Heavy Industries in Geoje, South Korea, is 256.4 m long and 48 m wide with a deadweight of 135,000 tons. It has a production capacity of 63,000 barrels a day and a storage capacity of 800,000 barrels. The FPSO will operate on the Knarr oil and gas field in the Norwegian North Sea for BG Norge.

Project challenges

The main challenges, which were dealt with effectively during project preparation and execution, were: 

  • Weather: The typhoon season in the Northwestern Pacific starts at this time of year. In addition, the Cape of Good Hope was rounded during the local winter. Several weather agencies monitored the weather under way closely and forecasts were used as a basis for decisions by the experienced crew on board. 
  • Towage by three tugs: Well-documented and well-trained procedures were in place specifically for three-tug towage to prevent any unsafe situations during the tow.
  • Logistics: The various scheduled port calls were carefully planned and executed with assistance from local port agents to prevent unnecessary loss of time. 

Conclusion

The FPSO Petrojarl Knarr was towed effectively and safely, despite the distance and weather limitations along the route. With an average speed of 10.74 knots the three Fairmount tugs towed the FPSO more than 16,000 miles from South Korea to Norway in just 61 towing days, which is extremely fast, especially for an FPSO this size. Evaluating the project preparation and execution, it can be concluded that the operational best practices with the experienced crew on board were decisive for the safe, controlled and successful execution of this towage.

Related projects

Selected filters
TSHD_Queen_of_the_Netherlands_dredging_hard_spot_close_to_the_existing_SPM_header.jpg

Subsea pipeline repair, Bukom SBM

The Shell Bukom Refinery on Bukom Island imports the bulk of its crude oil feedstock through a Single Buoy Mooring (SBM) situated approximately 5.2 km from the island in the deeper water necessary to accommodate Very Large Crude Carriers.

131007_1_Sunset_in_the_field_header.jpg

Mooring installation and hook-up, OSX3

OGX - OSX is a Brazilian oil and gas company owning and operating several floating facilities in Brazil. MODEC secured the FPSO purchase contract and subsequently awarded Boskalis the Mooring Installation & Hook-up contract. The FPSO had to be installed in the Tubarão Martelo Field, located in the Campos Basin, Brazil, in 105 meters water depth.

IMG_0814_header.jpg

Dredging, Sealine COEFR

The Crude Oil Export Facility Reconstruction (COEFR) Project aims to stabilize and expand Iraq’s crude oil export capacity, a lifeline of the Iraqi economy, by constructing a pipeline connecting crude oil storage facilities to the offshore crude oil export terminal in Fao, Basrah in Southern Iraq. The Project involves the development of two offshore valve station platforms, a 75 kilometer 48” oil pipeline and a Single Point Mooring system.

NWS_Barge_near_completion_header.jpg

Refurbishment water station, Olero Creek

In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration Project (OCR) is a 70 million US$ construction and commissioning subcontract. The scope of work is the refurbishment and reinstatement of the North Water Station (NWS) and its hook up to the interconnecting piping at Olero Creek.

Provision and installation of submarine fiber optic cable, Strait of Magellan

In September 2011 Boskalis was awarded a contract worth approximately EUR 30 million to provide and install a submarine fiber optic cable across the Strait of Magellan, Argentina. The contract was awarded by the state-owned corporation AR-SAT (Empresa Argentina de Soluciones Satelitales S.A.).

PAG_9_TRANSPORT_FLEET_SUPPORTS_LINCS_WINDFARM_CONSTRUCTION_-_Groot_header.jpg

Offshore wind farm, LINCS

SMIT Transport is transporting the wind turbine foundations for the new Lincs Offshore Windfarm, situated off Great Yarmouth, UK. When completed, the windfarm will consist of 75 turbines capable of generating sufficient power to meet the annual demand of some 200,000 households.